Perencanaan Biaya Dan Waktu Pelaksanaan Pada Proyek Perkantoran Graha Solobhakti Trading & Contractor

Sari, Tutut Amilia (2018) Perencanaan Biaya Dan Waktu Pelaksanaan Pada Proyek Perkantoran Graha Solobhakti Trading & Contractor. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111500000042-NON_DEGREE.pdf]
Preview
Text
10111500000042-NON_DEGREE.pdf - Accepted Version

Download (13MB) | Preview

Abstract

Proyek Perkantoran Graha Solobhakti Trading & Contractor (STC) yang berlokasi di jalan bali nomor 23 ini memiliki luas bangunan ± 733 m2 dan 9 lantai. Dalam proyek tersebut diperlukan perencanaan biaya dan waktu yang akan dibahas dalam tugas akhir ini. Perhitungan perencanaan meliputi perhitungan volume pada setiap pekerjaan, produktivitas, durasi yang dibutuhkan dalam setiap pekerjaan, biaya sewa alat, bahan yang dibutuhkan, dan upah tenaga kerja. Batasan perhitungan perencanaan dalam tugas akhir ini yaitu level 2 sampai dengan level 6.
Dari perhitungan perencanaan tersebut, adapun data yang diperoleh yaitu metode pelaksanaan, jumlah biaya pelaksanaan, dan waktu pelaksanaan yang dibutuhkan. Biaya pelaksanaan proyek adalah sebesar Rp. 4.653.106.700,- Perhitungan waktu pelaksanaan dengan menggunakan alat bantu program Microsoft Project didapatkan waktu penyelesaian proyek selama 112 hari.
==============================================================================================================
Graha Solobhakti Trading & Contractor (STC) Office Project located on the 23rd street of Bali has a building area of ± 733 m2 and 9 floors. In the project required cost and time planning that will be discussed in this final project. Planning calculations include the calculation of the volume of each job, the productivity, the duration required in each job, the cost of equipment rent, the materials needed, and the wage of labor. Limitation of planning calculation in this final project is level 2 to level 6.
The result obtained for this project are construction metodh, implementation time and cost planning. The cost planning of this project is Rp. 4.653.106.700,- The calculation of implementation time with program tool “Microsoft Project” got time to complete this project is 112 days.

Item Type: Thesis (Diploma)
Additional Information: RSIS 692.5 Sar p-1 3100018077169
Uncontrolled Keywords: cost, time implementation
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Tutut Amilia Sari
Date Deposited: 15 Feb 2019 03:34
Last Modified: 23 Nov 2020 06:52
URI: http://repository.its.ac.id/id/eprint/53752

Actions (login required)

View Item View Item