Estimasi Biaya Dan Waktu Pelaksanaan Proyek Penggan Jembatan Sempar, (Madura)

Krisnanda, Tatag Egah (2018) Estimasi Biaya Dan Waktu Pelaksanaan Proyek Penggan Jembatan Sempar, (Madura). Undergraduate thesis, Institiut Teknologi Sepuluh Nopember.

[thumbnail of 10111715000029-Undergraduated_Theses.pdf]
Preview
Text
10111715000029-Undergraduated_Theses.pdf - Accepted Version

Download (21MB) | Preview

Abstract

Proyek penggantian jembatan Sempar kecamatan Blega-Madura merupakan jembatan yang dibangun sebagai pengganti yang lama. Jembatan Sempar memiliki panjang 40,6 m dan bentang 7,5 m yang melintasi sebuah sungai. Proyek ini dikerjakan oleh kontraktor PT.Karya Tunggal Mulya Abadi dan PT. Gala Karya, KSO. Kontruksi proyek menggunakan pondasi tiang pancang dan konstruksi beton bertulang. Pekerjaan proyek meliputi : pekerjaan persiapan, pekerjaan pondasi, pekerjaan beton, pekerjaan girder, dan pekerjaan perkerasan aspal.
Dalam tugas akhir ini merencankan Estimasi biaya dan waktu pelaksanaan pekerjaan pada pekerjaan pondasi, pekerjaan struktur beton, pekerjaan girder, dan pekerjaan perkerasan aspal. Metode yang digunakan pada tugas akhir ini adalah meninjau langsung proyek dan memperoleh data lapangan, membuat analisa harga satuan dan durasi setiap item pekerjaan. Selanjutnya menentukan jaringan kerja (network planning) dengan menggunakan alat bantu software Microsoft office project 2013. menentukan kembali volume pekerjaan dan menentukan jadwal atau durasi pekerjaan.
Berdasarkan hasil analisa diperoleh rencana anggaran biaya pelaksanaan pada proyek ini adalah sebesar Rp. 5.758.871.117,72 (Lima milyar tujuh ratus lima puluh delapan juta delapan ratus tujuh puluh satu ribu serratus tujuh belas koma tujuh puluh dua rupiah). dengan durasi waktu pelaksanaan pekerjaan proyek selama 155 hari.
=============================================================================The replacement project of the sub-district bridge Blega-Madura is a bridge builts as a replacement for the old bridge. The bridge spans 40,6 m long and spans 7,5 m across a river. This project was done by PT.Karya Tunggal Mulya Abadi and PT. Gala Karya, KSO contractors. Project construction using pile foundation and reinforced concrete construction. Project work include : preparatory work, foundation work, concrete work, girder work, and ashalt pavement work.
In this final project planning cost and time of work implementation on foundation work, concrete structure work, girder work, and asphalt pavement work. The metod that used in this final project is direct review of the project and obtain field date, analyse unit price and duration of each work item. Then determine the network by using software Microsoft office project 2013. Re-determine the volume of work and determine the schedule or duration of the work.
Based on the analysis result obtained budget plan implementation cost on this is Rp. 5.758.871.117,72 (Five billion seven hundred fifty eight million eight hundred seventy one thousand one hundred seventeen point seventy tworupiah)

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Metode pelaksanaan, Anggaran biaya pelaksanaan, waktu pelaksanaan.
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TG Bridge engineering
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: Tatag Egah Krisnanda
Date Deposited: 28 Jun 2021 02:47
Last Modified: 28 Jun 2021 02:47
URI: http://repository.its.ac.id/id/eprint/55325