Perancangan Mekanisme Tarif Listrik Untuk Mitigasi Risiko Ketidakpastian Pola Operasional yang Berdampak pada Profitabilitas Perusahaan (Studi Kasus: Pembangkit Listrik PT X)

Widyatama, Sandi (2018) Perancangan Mekanisme Tarif Listrik Untuk Mitigasi Risiko Ketidakpastian Pola Operasional yang Berdampak pada Profitabilitas Perusahaan (Studi Kasus: Pembangkit Listrik PT X). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02411440000076_Undergraduate_Theses.pdf]
Preview
Text
02411440000076_Undergraduate_Theses.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Tenaga listrik mempunyai peran yang sangat penting dan strategis dalam mewujudkan tujuan pembangunan nasional. Tenaga listrik menopang kebutuhan rumah tangga, bisnis, industri dan juga kepentingan umum. Dengan semakin meningkatnya kebutuhan tenaga listrik saat ini, melalui UU 30/2009 pemerintah memperbolehkan pihak swasta, koperasi atau swadaya masyarakat mendirikan unit pembangkit untuk memenuhi kebutuhan listriknya sendiri atau kebutuhan listrik umum namun mengajukan usulan tarif jual tenaga listrik dan memiliki perijinan usaha penyediaan tenaga listrik (IUPTL). PT X memiliki unit pembangkit dan akan memenuhi kebutuhan tenaga listrik untuk sebuah daerah sehingga penentuan tarif jual tenaga listrik menjadi hal penting. PT X dapat menerapkan struktur tarif dengan mempertimbangkan biaya investasi, biaya operasional dan biaya bahan bakar atau bisa disebut skema tarif A-B-C-D-E dan menghasilkan tarif listrik sebesar RP 1.452 / kWh. Analisis finansial menghasilkan indikator kelayakan finansial IRR sebesar 12% dan NPV 49,7 miliyar rupiah. Namun skema tarif tersebut memiliki risiko mengalami kerugian yang diakibatkan oleh beberapa faktor ketidakpastian seperti Indeks Harga konsumen, kurs mata uang, harga bahan bakar, konsumsi tenaga listrik serta derating dari unit pembangkit. Faktor-faktor tersebut akan digambarkan pola distribusnya dan akan dilakukan simulasi monte carlo untuk mengevaluasi tarif dengan risiko yang mungkin terjadi. Kemudian diperlukan mitigasi risiko dari faktor tersebut dengan menerapkan baseline tarif lisrik sebesar RP 1.473 / kWh untuk memtigasi risiko faktor ketidakpastian yang ada.
=========================================================
Electrical power has a very important and strategic role in realizing the goals of national development. Electric power supports household, business, industry and public needs. With the increasing demand for electricity today, through theUU 30/2009, the government allows private cooperatives or individual to set up power plant to meet their own electricity needs or general electricity needs but to propose electricity sales tariffs and have a business license for electricity supply (IUPTL). PT X has a power plant and will fulfill electric power needs for a region so the determination of electricity tariff is important. PT X can apply the tariff structure by considering investment cost, operational cost and fuel cost or it can be called the A-B-C-D-E tariff scheme and generate electricity tariff of RP 1,452 / kWh.. Financial analysis yields financial feasibility indicator of IRR 12% and NPV 49.7 billion rupiah. However, the tariff scheme has the risk of losses caused by some uncertainty factors such as consumer price index, currency exchange rate, fuel price, electricity consumption and derating from power plant. These factors will be illustrated by the distribution pattern and a monte carlo simulation will be conducted to evaluate tariffs with possible risks. Risk mitigation of these factors is applying the baseline tariff of RP 1.73 / kWh to mitigate the risks of changes in IHK, currency exchange rates and gas prices and accept the risk of uncertainty of electricity consumption and derating power plant.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kelayakan finansial, mitigasi risiko, skema tarif, Simulasi Monte carlo
Subjects: T Technology > T Technology (General) > T174.5 Technology--Risk assessment.
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Widyatama Sandi
Date Deposited: 13 Apr 2021 02:37
Last Modified: 13 Apr 2021 02:37
URI: http://repository.its.ac.id/id/eprint/56529

Actions (login required)

View Item View Item