Pemodelan Sistem Pengambilan Keputusan Pemeliharaan Aset Irigasi Dengan SIG Dan Fuzzy AHP

Fitra, Rifandry (2015) Pemodelan Sistem Pengambilan Keputusan Pemeliharaan Aset Irigasi Dengan SIG Dan Fuzzy AHP. Undergraduate thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 9112202813-Master Thesis.pdf]
Preview
Text
9112202813-Master Thesis.pdf - Published Version

Download (3MB) | Preview

Abstract

Pengelolaan aset – aset irigasi secara terstruktur dan terpadu diperlukan agar
sistem irigasi dapat bekerja secara maksimal. Salah satu unsur yang terpenting dalam
pengelolaan aset irigasi adalah pemeliharaan. Tanpa usaha pemeliharaan, aset – aset
irigasi dapat mengalami kerusakan yang berdampak kepada proses irigasi ke lahan-lahan
pertanian menjadi tidak merata, serta menimbulkan banyak masalah seperti menurunnya
pasokan air ke lahan pertanian yang membuat menurunnya produksi pertanian dan
penghasilan para petani yang secara otomatis berkurang.
Penelitian ini bertujuan untuk merancang sebuah model Sistem Pengambilan
Keputusan yang dapat mendokumentasikan letak aset irigasi dan mempermudah
pengambilan keputusan dalam kegiatan pemeliharaan aset irigasi. Perancangan model
sistem ini mencakup kegiatan pembuatan diagram entiti relasional, relasi basis data
dengan menggunakan PostgreSQL, pengumpulan dan input data, pengolahan kuesioner
dengan metode Fuzzy Analytical Hierarchy Process (FAHP) untuk mencari prioritas
pemeliharaan aset irigasi, pembuatan layer aset irigasi dengan menggunakan Quantum
GIS 2.6 serta penggabungan Fuzzy Analytical Hierarchy Process dengan sistem informasi
geografis.
Untuk implementasi model yang dibangun, penulis menggunakan jaringan irigasi
Daerah Irigasi Way Curup sebagai studi kasus. Hasil yang diperoleh berupa peta tematik
yang dapat memperlihatkan keberadaan aset irigasi, basis data aset irigasi yang dapat
memperlihatkan informasi dasar, kerusakan , metode pemeliharaan, skor prioritas dan
skala prioritas pemeliharaan aset irigasi. Dalam studi kasus ini, digunakan 24 aset irigasi
yang mengalami kerusakan sebagai bahan percobaan. berdasarkan hasil penelitian
diperoleh ada empat (4) aset yang memiliki memiliki prioritas pertama (I), enam (6) aset
memiliki prioritas kedua (II) dan tiga belas (13) aset memiliki prioritas ketiga (III).
==========================================================================================================
An integrated and structured irrigation assets management is needed to maximize
irrigation system function. One of the most important factor in irrigation asset
management is maintenance. Without maintenance, irrigation assets could suffer damages
that may affecting irrigation process to the farming fields, also many other problems may
arise, like water supplies declining that could make farming production and farmer‟s
revenue automatically decline.
This research‟s objective is to design a decision making system that can save
irrigation asset location dan can provide suggestion in irrigation asset maintenance. This
system model designing process includes designing of relational entity diagram, database
relation with PostgreSQL, collecting and inputing datas, questionnaire tabulation with
Fuzzy Analytical Hierarchy Process (FAHP) method for acquiring priority at irrigation
assets maintenance, irrigation asset layer making with Quantum GIS 2.6 and a
combination process of Fuzzy Analytical Hierarchy Process with Geographic Information
System.
For this system model implementation, writer use Way Curup Irrigation Sytem for
case study. The result from this research is in a form of digital map that can shows
irrigation asset location, irrigation asset database that can shows the basic informations,
damage level and its details, maintance methods and priority score from irrigation assets.
In this case study, writer were using 24 irrigation asset that suffer damages as
experiments. According to the research result there are four (4) assets that get the first
priority, six (6) assets that get the second priority and thirteen (13) assets that get the third
priority.

Item Type: Thesis (Undergraduate)
Additional Information: RTMT 658.403 Fit p
Uncontrolled Keywords: Pemodelan, Sistem Pengambilan Keputusan, Sistem Informasi Geografis, Fuzzy Analytical Hierarchy Process, Prioritas, Aset Irigasi
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis.
Divisions: 61101-Magister Management Technology
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 22 May 2019 06:38
Last Modified: 22 May 2019 06:38
URI: http://repository.its.ac.id/id/eprint/63059

Actions (login required)

View Item View Item