Perencanaan peningkatan ruas jalan Sambiroto-Kweden STA. 0+000 - STA. 3+000 dengan menggunakan perkerasan kaku di Kabupaten Mojokerto - Provinsi Jawa Timur

Setiawan, Bayu Eko and Hariyanto, Rissandy Daniar Pratama (2014) Perencanaan peningkatan ruas jalan Sambiroto-Kweden STA. 0+000 - STA. 3+000 dengan menggunakan perkerasan kaku di Kabupaten Mojokerto - Provinsi Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3111030091-3111030093-Non Degree.pdf]
Preview
Text
3111030091-3111030093-Non Degree.pdf

Download (8MB) | Preview

Abstract

Proyek peningkatan ruas jalan Sambiroto – Kweden
merupakan proyek pelebaran jalan. Ruas jalan Sambiroto –
Kweden merupakan Jalan Alternatif ke Kabupaten Jombang –
Provinsi Jawa Timur dan daerah lainnya. Proyek ini dilakukan
bertujuan untuk memberikan tingkat pelayanan yang lebih baik,
dikarenakan beberapa titik di jalan ini telah rusak dan berlubang.
Selain itu, lebar jalan yang ada masih belum memadai bagi
pengguna jalan. Agar dapat terwujudnya kelancaran dan
kenyamanan dalam berlalu lintas maka direncakan proyek
peningkatan ruas jalan Sambiroto – Kweden STA. 0+000 – STA.
3+000 Kabupaten Mojokerto – Provinsi Jawa Timur.
Peningkatan jalan meliputi perhitungan Analisis
Kapasitas Jalan dengan metode Manual Kapasitas Jalan
Indonesia, 1997 (MKJI 1997) jalan luar kota. Menghitung tebal
perkerasan jalan menggunakan perkerasan kaku dengan metode
SNI Perencanaan Perkerasan Jalan Beton Semen Departemen
Permukiman dan Prasarana Wilayah, Pd T 14 – 2003. Geometrik jalan dengan menggunakan Dasar – Dasar Perencanaan
Geometrik, (oleh Silvia Sukirman). Perencanaan drainase dengan
menggunakan metode SNI – 03 – 342 – 1994 (Tata Cara
Perencanaan Drainase Jalan), dan rencana anggaran biaya dengan
menggunakan HSPK (Harga Satuan Pokok Kegiatan) Provinsi
Jawa Timur tahun 2014.
Dari hasil perhitungan perencanaan peningkatan ruas
jalan Sambiroto – Kweden, pelebaran jalan dilakukan pada awal
umur rencana tahun 2016 sesuai dengan Peraturan Pemerintah
Nomor 34 tahun 2006 untuk jalan Kolektor Primer, yakni
dibutuhkan lebar minimum 9 m, dikarenakan kondisi eksisiting
lebar jalan hanya 4 m dengan tipe jalan 2/2 UD, sehingga perlu
diperlebar menjadi 9 m dengan tipe jalan tetap 2/2 UD. Tebal
perkerasan kaku 20 cm dengan beton K – 300 serta pondasi
bawah dengan CBK 15 cm. Perencanaan saluran tepi drainase
setelah dilebarkan dengan menggunakan bentuk persegi dengan
material batu kali. Biaya yang dibutuhkan untuk pembangunan
proyek ini adalah sebesar Rp. 18.568.136.915 (Terbilang Delapan
Belas Milyar Lima Ratus Enam Puluh Delapan Juta Seratus Tiga
Puluh Enam Ribu Sembelin Ratus Lima Lima Belas Rupiah).

===========================================================================================================

Sambiroto road improvement project - Kweden a road
widening project. Sambiroto roads - Kweden an Alternative Way
to Jombang - East Java Province and other regions. The project
was carried out aiming to provide a better level of service, due to
some point on this road has been damaged and perforated. In
addition, the width of the road is still not adequate for road users.
In order to realization of smoothness and comfort in traffic then
planned road improvement projects Sambiroto - Kweden STA. 0
+000 - STA. 3 +000 Mojokerto - East Java Province.
Improved roads include Highway Capacity Analysis
calculation method Indonesian Highway Capacity Manual, 1997
(MKJI 1997) outside the city streets. Calculate the pavement
thickness using rigid pavement with SNI method of Cement
Concrete Road Pavement Planning Ministry of Settlement and
Regional Infrastructure, Pd T 14-2003. Geometric path using
Basic - Basic Geometric Planning, (by Silvia Sukirman).
Drainage plan using SNI - 03 - 342 - 1994 (the Road Drainage
Planning Procedures), and the budget plan by using HSPK (Basic
Unit Price Activity) of East Java Province in 2014. From the calculation of road improvement plan
Sambiroto - Kweden, road widening is done at the beginning of
the plan year 2016 in accordance with Government Regulation
No. 34 of 2006 for Primary collector streets, which required a
minimum width of 9 m, due to the condition eksisiting road only
4m wide with the type of road 2/2 UD, so it needs to be widened
to 9 m with the type of road fixed 2/2 UD. 20 cm thick rigid
pavement with concrete K - 300 and the subbase with CBK 15
cm. Planning the edge of the drainage channel after dilated by
using a square shape with stone material. The cost required for
construction of this project is Rp. 18,568,136,915 (Somewhat
Eighteen Billion Five Hundred Sixty-Eight Million Six Hundred
Thirty Thousand Five Hundred Fifteen Sembelin Rupiah).

Item Type: Thesis (Diploma)
Additional Information: RSS 625.7 Set p
Uncontrolled Keywords: Peningkatan jalan; Perkerasan beton semen; Kontrol geometrik; Drainase jalan; Rencana anggaran biaya
Subjects: T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3
Depositing User: - Taufiq Rahmanu
Date Deposited: 12 Jul 2019 02:32
Last Modified: 12 Jul 2019 02:32
URI: http://repository.its.ac.id/id/eprint/63923

Actions (login required)

View Item View Item