Rumah Sakit Umum PHC Klas C di Banjarmasin

Zulkarnaen, Guruh Pratama (2016) Rumah Sakit Umum PHC Klas C di Banjarmasin. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3215111002-master-theses.pdf]
Preview
Text
3215111002-master-theses.pdf - Published Version

Download (4MB) | Preview

Abstract

Sejalan dengan pengembangan Bisnis Pelindo III yang pesat maka sarana dan prasarana fisik
juga dikembangkan secara pesat termasuk fasilitas kesehatannya. Seperti halnya
perkembangan PT. Pelindo III sebagai pemilik, maka RS PHC Surabaya juga berkembang
dengan pesat. Peningkatan kualitas layanan, penambahan kapasitas serta penambahan fasilitas
pelayanan makin memperkuat posisi RS PHC sebagai RS Pelabuhan yang andal, yang bahkan
kini menjadi anchor untuk RS di wilayah Surabaya Utara.
Melihat kondisi di atas serta adanya perkembangan pada wilayah-wilayah operasional Pelindo
III lainnya maka pengembangan fasilitas kesehatan berupa RS pelabuhan dipandang menjadi
bagian yang tidak terpisahkan. Sebagai langkah awal, wilayah operasional yang akan
dikembangkan fasilitas RS pelabuhannya adalah area kerja Banjarmasin. Pada dasarnya
fasilitas ini menjadi satu jejaring dengan RS PHC Surabaya sebagai induknya.
Pembangunan RS PHC Banjarmasin menjadi bagian dari peningkatan mutu pelayanan dan
pemerataan pelayanan kesehatan di Kota Banjarmasin. Pembangunan Rumah Sakit tersebut
dilaksanakan pada lahan kosong milik Pelindo III dan diharapkan dapat meningkatkan nilai
kawasan, karena berada dekat area pusat pemerintahan kota, Pembangunan RS PHC
Banjarmasin harus mempertimbangkan konsep jejaring dengan RS PHC induk yang berada di
Surabaya tanpa meninggalkan elemen lokalitas setempat.
RS PHC Banjarmasin mengikuti Prasyarat Arsitektur dan Lingkungan dengan menjamin
terwujudnya bangunan gedung berdasar karakteristik lingkungan dan budaya daerah sehingga
seimbang serasi dan selaras dengan lingkungannya, menjamin terwujudnya tata ruang hijau
yang dapat memberikan keseimbangan dan keserasian bangunan terhadap lingkungannya dan
menjamin bangunan gedung dibangun dan dimanfaatkan dengan tidak menimbulkan dampak
negatif terhadap lingkungan.
RS PHC Banjarmasin juga mengikuti Kriteria Khusus yang mana dikaitkan dengan upaya
pelestarian lingkungan dan konservasi energi dan kesatuan perencanaan bangunan dengan
lingkungan yang ada disekitarnya.
==========================================================
In line with the business development of Pelindo III rapid the physical infrastructure also
developed rapidly, including their health facilities. As well as the development of PT. Pelindo
III as the owner, then the Pelindo Health Care (PHC) Hospital Surabaya is also growing rapidly.
Improved quality of service, increase capacity as well as additional service facilities further
strengthens the position of the Port Hospital RS PHC as a reliable, which even now the anchor
for the Hospital in the region of North Surabaya.
Seeing the above conditions as well as the developments in the operational areas, the
development of Pelindo III other health facilities such as hospitals port is seen to be an integral
part. As a first step, the operational area which will be developed hospital facilities Banjarmasin
port is the work area. Basically these facilities into one network with Pelindo Health Care
(PHC) Hospital Surabaya as its main of part.
Cconstruction of Pelindo Health Care (PHC) Hospital Banjarmasin be part of improving
quality of care and equity of health services in the city of Banjarmasin. Hospital construction
was held on vacant land belonging to Pelindo III and is expected to increase the value of the
area, because it is located near the central area of the city administration, the construction of
Pelindo Health Care (PHC) Hospital Banjarmasin should consider the concept of networking
with main of part PHC Hospital is in Surabaya without leaving the local locality element.
Pelindo Health Care (PHC) Hospital Banjarmasin follow Prerequisites Architecture and
Environment to ensure the realization of buildings based on environmental characteristics and
culture of the area so balanced and in harmony with the environment, ensuring the realization
of green space that can provide the balance and harmony of the building on the environment
and ensure the building is built and utilized with no a negative impact on the environment.
Pelindo Health Care (PHC) Hospital Banjarmasin also follow Special Criteria which is
associated with effort to the preservation of the environment and energy conservation and
building planning unity with the environment around it.

Item Type: Thesis (Undergraduate)
Additional Information: RPA 725.51 Zul r
Uncontrolled Keywords: Green Architecture, Rumah Sakit, Umum Klas C, Banjarmasin
Subjects: N Fine Arts > NA Architecture > NA9051 Residential areas. Site planning
Divisions: Faculty of Civil Engineering and Planning > Architechture > 23201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 21 Nov 2019 06:32
Last Modified: 21 Nov 2019 06:32
URI: http://repository.its.ac.id/id/eprint/71943

Actions (login required)

View Item View Item