Penentuan Konfigurasi Transposisi Pada Saluran Transmisi Sulawesi 275 kV Untuk Mengurangi Ketidakseimbangan Tegangan

Pratama, Aldy Yuniar (2020) Penentuan Konfigurasi Transposisi Pada Saluran Transmisi Sulawesi 275 kV Untuk Mengurangi Ketidakseimbangan Tegangan. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111640000149-Undergraduate_Thesis .pdf]
Preview
Text
07111640000149-Undergraduate_Thesis .pdf

Download (3MB) | Preview

Abstract

Saluran transmisi 275 kV Pamona – Wotu – Latuppa merupakan backbone transmisi yang menyalurkan pasokan daya listrik ke sistem interkoneksi Sulawesi Bagian Selatan dan Sulawesi Tengah. Sistem interkoneksi Sistem Sulbagsel – Sulteng menyalurkan daya dari pembangkit PLTA Poso 3 x 65 MW melalui saluran transmisi dengan panjang bentangan kurang lebih 209 kms dari Kabupaten Poso hingga Kota Palopo. Dari total bentangan saluran transmisi tersebut terdapat perbedaan ketidakseimbangan tegangan mencapai 7 kV pada salah satu phasa konduktor. Hal tersebut mengakibatkan permasalahan pada kondisi operasi sistem seperti meningkatnya rugi-rugi saluran dan pemanasan pada transformer serta penurunan performansi dari relay pengaman pada sistem. Untuk mengurangi ketidakseimbangan tegangan yang terjadi dapat dilakukan transposisi pada saluran transmisi tersebut. Dalam tugas akhir ini, studi transposisi dilakukan untuk mengetahui penyebab ketidakseimbangan tegangan pada saluran transmisi 275 kV Pamona-Wotu-Latuppa dengan mempertimbangkan Line Voltage Unbalance Rate (LVUR) dan menentukan konfigurasi transposisi pada sistem tranmisi sehingga ketidakseimbangan tegangan akan turun sesuai standar LVUR yang telah ditetapkan. Berdasarkan hasil analisis, konfigurasi transposisi dapat menurunkan nilai LVUR paling rendah dicapai pada angka 0,04%. Dengan semakin rendahnya nilai LVUR maka ketidakseimbangan tegangan sistem dapat berkurang.

=========================================================

The 275 kV Pamona - Wotu - Latuppa transmission line is a transmission backbone that supplies electric power supply to the interconnection systems of Southern and Central Sulawesi. Interconnection system The Sulbagsel - Central Sulawesi system transfers power from the 3 x 65 MW Poso hydropower plant through a transmission line with a length of approximately 209 kms from Poso Regency to Palopo City. From the total stretch of the transmission line, there are differences in voltage unbalance reaching 7 kV in one of the conductor phases. This results in problems with the system operating conditions such as increased line losses and heating on the transformers and decreased performance of the protection relays on the system. To reduce the voltage unbalance that occurs, transposition can be done on the transmission line. In this final project, a transposition study is carried out to determine the cause of voltage unbalance in the 275 kV Pamona-Wotu-Latuppa transmission line by considering the Line Voltage Unbalance Rate (LVUR) and determining the transposition configuration in the transmission system so that the voltage unbalance will be reduced according to the specified LVUR standard. Based on the analysis results, the transposition can reduce the LVUR to lowest value achieved at 0,04%. With the lower value of LVUR, the system voltage unbalance can be reduced.

Item Type: Thesis (Other)
Uncontrolled Keywords: Transmission Line Transposition, Voltage Unbalance, LVUR Transposisi Saluran Transmisi, Voltage Unbalance, LVUR
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK201 Electric Power Transmission
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Aldy Yuniar Pratama
Date Deposited: 13 Aug 2020 02:15
Last Modified: 29 May 2023 07:51
URI: http://repository.its.ac.id/id/eprint/77563

Actions (login required)

View Item View Item