Items where Author is "Akbar, Muhammad Riziq"

Group by: Item Type | No Grouping
Number of items: 2.

Akbar, Muhammad Riziq (2023) Perhitungan Waktu Dan Biaya Pekerjaan Struktur Pada Proyek Pembangunan Hotel Ibis Shafira Bintang 4 Surabaya Dengan Menggunakan Bekisting Alumunium. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Arifah, Ana Ghayatul and Akbar, Muhammad Riziq (2017) Perencanaan Struktur Gedung Kuliah Fakultas Teknik Di Malang Dengan Metode Sistem Rangka Pemikul Momen Menengah. Diploma thesis, Institut Teknologi Sepuluh Nopember.

This list was generated on Wed Apr 24 07:36:50 2024 UTC.