Items where Author is "Amal, Mahar Ichlasul"

Group by: Item Type | No Grouping
Number of items: 2.

Amal, Mahar Ichlasul (2019) Perhitungan Waktu Dan Biaya (RAB) Pada Proyek Pembangunan Jalan Tol Pandaan-Malang Seksi 2 Purwodadi Lawang (Sta 15+350 – Sta 20+000). Diploma thesis, Institut Teknologi Sepuluh Nopember.

Utomo, Tori and Amal, Mahar Ichlasul (2018) Optimasi Tenaga Kerja Dan Alat Berat Pada Pekerjaan Pemancangan P1 Di Proyek Jembatan Sembayat II. Diploma thesis, Institut Teknologi Sepuluh Nopember.

This list was generated on Wed Apr 24 22:12:36 2024 UTC.