Items where Author is "Warapsari, Nur"

Group by: Item Type | No Grouping
Number of items: 1.

Warapsari, Nur (2023) Analisa Percepatan Waktu pada Proyek Underpass Ramp 6 Pada Sta 6+150 - 6+345.613 Pembangunan Jalan Tol Cileunyi – Sumedang – Dawuan Seksi 1 Tahap 3 Menggunakan Metode Time Cost Trade Off (TCTO). Diploma thesis, Institut Tekonologi Sepuluh Nopember.

This list was generated on Sat Nov 23 01:40:59 2024 UTC.