Items where Division is "Civil Infrastructure Engineering (D4)" and Year is 2017
Jump to: Thesis
Number of items: 1.
Thesis
Salwaludna, Mega Afanin (2017) Perhitungan Waktu dan Biaya Pelaksanaan pada Proyek Hotel Padma Semarang dengan Menggunakan Aluminium Formwork. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.