Manajemen Pelaksanaan Konstruksi Dinding Inlet Saluran Terbuka Pada Proyek Pembangunan Sodetan Kali Ciliwung Ke Kanal Banjir Timur

Raditya, Akmal (2023) Manajemen Pelaksanaan Konstruksi Dinding Inlet Saluran Terbuka Pada Proyek Pembangunan Sodetan Kali Ciliwung Ke Kanal Banjir Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910020046-Undergraduate_Thesis.pdf] Text
10111910020046-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (86MB) | Request a copy

Abstract

Proyek Pembangunan Sodetan Kali Ciliwung Ke Kanal Banjir Timur (KBT) berlokasi di Kota Jakarta Timur, Kecamatan Jatinegara (Awal sodetan di kali Cliwung kelurahan Bidara Cina, akhir sodetan di kali Cipinang atau Kanal Banjir Timur kelurahan Cipinang Besar Selatan). Proyek ini merupakan proyek yang diprakarsai oleh Kementerian Pekerjaan Umum dan Perumahan Rakyat. Proyek ini merupakan salah satu prioritas utama Pemerintah khususnya Provinsi DKI Jakarta dalam mengurangi banjir yang sering terjadi di daerah Kali Ciliwung. Perhitungan waktu dan biaya pada proyek ini dilakukan dengan membuat Work Breakdown Structure (WBS) dan perhitungan volume terlebih dahulu pada tiap item pekerjaannya. Perhitungan waktu diperoleh dari perhitungan produktivitas tiap alat yang digunakan sehingga menghasilkan durasi, koefisien alat, dan tenaga kerja. Perhitungan biaya meliputi biaya tenaga kerja, bahan dan juga alat yang harga satuannya menggunakan dari data harga survey dan juga harga-harga satuan yang diperoleh dari perusahaan yang lokasi proyeknya berdekatan dengan lokasi penelitian, sehingga dari perhitungan tersebut didapatkan Rencana Anggaran Pelaksanaan (RAP). Penyusunan penjadwalan proyek mengunakan program bantu Microsoft Project hingga mendapatkan hasil akhir Kurva-S. Hasil yang didapatkan dalam penelitian ini adalah waktu pembangunan Dinding Inlet hingga Dinding Pintu Air yaitu 248 hari. Biaya tota untuk pelaksanaan pembangunan proyek sebesar RP67,317,201,244 terbilang Enam Puluh Tujuh Milyar Tiga Ratus Tujuh Belas Juta Dua Ratus Satu Ribu Dua Ratus Empat Puluh Empat Rupiah.
=================================================================================================================================
The Ciliwung River Shortcut Development Project to the East Flood Canal (KBT) is located in East Jakarta City, Jatinegara District (The beginning of the shortcut in the Cliwung river, Bidara Cina village, the end of the shortcut in the Cipinang river or the East Flood Canal, Cipinang Besar Selatan village). This project was initiated by the Ministry of Public Works and Housing. This project is one of the main priorities of the Government, especially DKI Jakarta Province in reducing flooding that often occurs in the Ciliwung River area. The calculation of time and cost in this project is carried out by making a Work Breakdown Structure (WBS) and volume calculation in each work item first. The time calculation is obtained from the calculation of the productivity of each equipment used so as to result in duration, equipment coefficient, and manpower. Cost calculations include manpower costs, material costs and equipment cost whose unit prices are used from survey price data and also unit prices obtained from companies whose project locations are close to the research location, so that from these calculations an Implementation Budget Plan (RAP) is obtained. Arranging project scheduling by using the Microsoft Project program to get the final results of the S-Curve. The results of this research are the construction time of the Inlet Wall to the Watergate Wall, which is 248 days. The total cost used for the implementation of project construction amounted to RP67,317,201,244 is calculated as Sixty Seven Billion Three Hundred Seventeen Million Two Hundred One Thousand Two Hundred Forty Four Rupiah.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: WBS, rencana anggaran pelaksanaan, waktu pelaksanaan, penjadwalan proyek, dan kurva S
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Akmal Raditya
Date Deposited: 24 Oct 2023 04:12
Last Modified: 24 Oct 2023 07:42