Items where Subject is "T Technology > TH Building construction > TH438 Construction industry--Management. Project management."

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: - | A | B | D | F | H | I | K | S | T | W | Z
Number of items at this level: 23.

-

-, Yomelda (2015) Analisa Earned Value Terhadap Biaya dan Waktu Pada Proyek Pembangunan Vimala Hills Villa & Resort Bogor. Undergraduate thesis, Institut Technology Sepuluh Nopember.

A

Alfiatrianti, Nia (2005) Perencanaan Metode Pelaksanaan Tower 333 Meter. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Andrean, Stevie (2018) Analisis Pengaruh Faktor Penyebab Non-Excusabe Delay Pada Proyek Konstruksi Gedung Di Manado. Masters thesis, Institut Teknologi Sepuluh Nopember.

B

Bahri, Khaerul (2018) Penerapan Rekayasa Nilai (Value Engineering) Pekerjaan Arsitektural Pada Pembangunan Proyek Transmart Carrefour Padang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Bahtiar, Mohamad Yusuf (2018) Analisa Perbandingan Waktu Dan Biaya Pada Proyek Pembangunan Tol Mojokerto - Kertosono Seksi 2 STA 5+000 - 24+900. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

D

Darmawan, Rahmat Ridho (2018) Simulasi Operasi Konstruksi Pekerjaan Beton Pada Proyek Hotel Dafam Kayon Surabaya Menggunakan Cyclone. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

F

Faisal, Fahmi (2017) Analisis Faktor Utama Yang Mempengaruhi Waktu Pelaksanaan Proyek Pembangunan Infrastruktur LRT (Light Rail Transit) Jabodebek. Masters thesis, ITS.

H

Hermawan, Agung. T (2005) Peningkatan Pengendalian Mutu Pengadaan Bahan Bagi Proyek Pembangunan Pabrik Chlorine Dioxide PT. Indah Kiat Pulp & Paper ( PT. IKPP ) Lokasi Perawang- Propinsi Riau Berdasarkan Standar ISO 9001: 2000. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

I

Imayanti, Basari (2017) Estimasi Risiko Proyek High Rise Building Pada Kontraktor. Masters thesis, ITS.

Inprasetyobudi, Hery (2015) Studi Pengembangan Model Strategi Operasi Pembangunan Kapal Berbasis Fasilitas Produksi. Masters thesis, Institut Teknologi Sepuluh Nopember.

K

Kurniawan, Ilham and ., Ulfiatussofa (2018) Perencanaan Pelaksanaan Pembangunan Struktur Gedung Fakultas Ekonomi Bisnis Islam (FEBI) Universitas Islam Negeri Sunan Ampel Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Kurniawan, Yoni Pamudra (2003) Penerapan Rekayasa Nilai Pada Proyek Pembangunan Gedung Rawat Inap Pavilyun RSUD Dr. Soetomo Surabaya Tahap IV. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

S

Saputra, Kurniadi (2018) Perencanaan Biaya dan Penjadwalan Pada Pembangunan Apartemen Taman Sari Mahogany Karawang (Tower A). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Saragih, Hansel Samuel Eiros (2017) Analisis Rework terhadap Biaya pada Proyek Pembangunan Apartemen Gunawangsa Tidar Surabaya dengan Metode Fault Tree Analysis (FTA) dan Expected Monetary Value (EMV). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Sasongko, Tonny Rizkya Nur (2018) Pengaruh Peran Project Management Office (PMO) Terhadap Kinerja Proyek Infrastruktur Ketenagalistrikan. Masters thesis, Institut Teknologi Sepuluh Nopember.

Suprayogi, Dohri and Yuliansa, Rahmat (2018) Metode Pelaksanaan Main Dam Bendungan Tukul Kabupaten Pacitan, Jawa Timur. Diploma thesis, Institut Teknologi Sepuluh Nopember.

Suselly, Elen (2005) Identifikasi Dan Respon Resiko Pada Pelaksanaan Proyek Gedung Di Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Sutrisna, Akhmad Reza (2018) Analisis Perbandingan Waktu Dan Biaya Metode Top-Down Dan Bottom-Up Pada Apartemen Grand Dharmahusada Lagoon. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

T

Taufik, Mohamad. H (2002) Analisa Biaya, Waktu Dan Metode Pelaksanaan Pekerjaan Dinding Diaphragma Dengan Sistem Beton Pracetak Dan Cor Setempat (Studi Kasus Proyek Jalan Under Way Tanah Abang Jakarta). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

W

Widaryanto, Benny (2003) Analisa Optimasi Pengendalian Material Pada Proyek Gedung Kuliah Dan Klinlk Universitas Kristen Petra Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Widianto, Hanny (2005) Pemilihan Peralatan Berat Yang Efisien Terhadap Waktu Dan Biaya Pada Proyek Pembangunan Fakultas Hukum Universitas Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Wihardjo, Widyanto (2001) Analisa AspekĀ·Aspek Teknis Yang Menyebabkan Keterlambatan Pelaksanaan Suatu Proyek (Studi Kasus Pada Proyek Pembangunan Gedung Fasilitas Dan Serbaguna Unpar). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

Z

Zanuardi, Arvian (2018) Pemanfaatan Prinsip Value for Money dalam Penentuan Prioritas Pemeliharaan Jalan Nasional di Perkotaan (Studi Kasus : Jalan Nasional di Wilayah Kota Surabaya. Masters thesis, Institut Teknologi Sepuluh Nopember.