Putra, Gerry Androw Pratama (2026) Evaluasi Dan Monitor Risiko Proyek Peningkatan Dan Rehabilitasi Jaringan Utama Irigasi BBWS Citarum. Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
6012221113-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (6MB) | Request a copy |
Abstract
Proyek irigasi umumnya dilaksanakan pada area yang luas dan tersebar dengan kondisi geografis yang beragam, memiliki jaringan saluran yang panjang, melibatkan berbagai pemangku kepentingan, serta harus tetap menjaga keberlangsungan layanan irigasi bagi masyarakat selama proses pembangunan berlangsung. Karakteristik tersebut menyebabkan proyek irigasi memiliki tingkat ketidakpastian dan risiko yang relatif tinggi. Oleh karena itu, diperlukan penerapan manajemen risiko yang sistematis untuk mengidentifikasi, menganalisis, mengevaluasi, dan mengendalikan berbagai risiko yang berpotensi mengganggu keberhasilan pelaksanaan proyek infrastruktur irigasi. Penelitian ini bertujuan untuk mengevaluasi residual risk pada risiko tinggi dan biaya kontingensi yang terjadi pada proyek irigasi. Penelitian ini menggunakan desain studi kasus pada Proyek Peningkatan dan Rehabilitasi Jaringan Utama Pemerintah Daerah pada BBWS Citarum dengan melibatkan responden dari pihak kontraktor. Penelitian ini menggunakan pendekatan metode Fault Tree Analysis (FTA) untuk mencari faktor penyebab risiko, Event Tree Analysis, (ETA) untuk mengevaluasi konsekuensi tindakan mitigasi yang sudah diterapkan dan pendekatan Expected Monetary Value (EMV) untuk mencari biaya kontingensi yang dibutuhkan. Penelitian menunjukkan 30 variabel yang relevan dengan Proyek Peningkatan dan Rehabilitasi Jaringan Utama Pemerintah Daerah pada BBWS Citarum dengan 24 variabel risiko dominan. Dari 24 variabel risiko dominan tersebut, lima risiko tertinggi yang dianalisis faktor penyebab risiko dengan metode Fault Tree Analysis menunjukkan bahwa peningkatan biaya operasional memiliki probabilitas tertinggi. Sedangkan untuk perhitungan konsekuensi mitigasi yang sudah dilakukan menggunakan Event Tree Analysis menunjukkan bahwa nilai konsekuensi tertinggi disebabkan oleh risiko bencana alam dengan konsekuensi sebesar Rp10.167.794.578,86. Biaya mitigasi yang diperoleh dari penelitian ini sebesar Rp11.560.180.756,57.
===================================================================================================================================
Irrigation projects are generally executed across expansive and geographically diverse areas, featuring long canal networks, involving multiple stakeholders, and requiring the continuous delivery of irrigation services to local communities during construction. These characteristics inherently expose irrigation projects to a relatively high degree of uncertainty and risk. Consequently, the systematic implementation of risk management is essential to identify, analyze, evaluate, and control potential risks that could compromise project success. This study aims to evaluate residual risks among high-risk events and determine the required contingency costs in irrigation projects. Employing a case study design, this research focuses on the Local Government Main Network Upgrading and Rehabilitation Project under the Citarum Major River Basin Organization (BBWS Citarum), engaging respondents from contractor organizations. The methodology integrates Fault Tree Analysis (FTA) to identify root causes of risks, Event Tree Analysis (ETA) to evaluate the consequences of implemented mitigation measures, and Expected Monetary Value (EMV) to quantify necessary contingency costs. The findings identified 30 relevant risk variables within the project, 24 of which were categorized as dominant risks. Among the top five high-risk variables analyzed via FTA, operational cost increases exhibited the highest probability. Furthermore, consequence calculations for the implemented mitigation measures using Event Tree Analysis indicate that the highest consequence value stems from natural disaster risk, amounting to IDR 10,167,794,578.86. Based on the analysis, the total mitigation cost required for this project was calculated at IDR 11,560,180,756.57.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Evaluasi Risiko, Monitor Risiko, Fault Tree Analysis, Event Tree Analysis, Biaya Kontingensi, Risk Evaluation, Risk Monitoring, Contingency Cost |
| Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
| Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis |
| Depositing User: | Gerry Androw Pratama Putra |
| Date Deposited: | 05 Aug 2026 03:32 |
| Last Modified: | 05 Aug 2026 03:32 |
| URI: | http://repository.its.ac.id/id/eprint/144014 |
Actions (login required)
![]() |
View Item |