Perbandingan Biaya Dan Waktu Antara Stuktur Baja Pembangunan Gudung Ruang Kuliah Universitas Trunojoyo Madura

S., Moch. Ricky Efendi (2016) Perbandingan Biaya Dan Waktu Antara Stuktur Baja Pembangunan Gudung Ruang Kuliah Universitas Trunojoyo Madura. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3114105039-Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview
[img]
Preview
Text
3114105039-Paper.pdf - Accepted Version

Download (197kB) | Preview
[img]
Preview
Text
3114105039-Presentation.pdf - Presentation

Download (1MB) | Preview

Abstract

Gedung Universitas Trunojoyo Madura terletak di Bangkalan, Madura. Gedung tersebut menggunakan konstruksi beton bertulang (eksisting) yang memiliki 4 (empat) lantai dengan luas 884 m2 dan rangka baja WF untuk struktur atapnya. Pada tahun 2013, gedung ini direncanakan ulang dengan menggunakan profil baja pada struktur utamanya, sementara struktur atapnya menggunakan profil baja siku. Tugas akhir ini bertujuan untuk mengetahui perbandingan biaya dan waktu antara struktur beton bertulang dengan struktur baja. Pada tugas akhir ini, acuan untuk menghitung perbandingan waktu pelaksanaan dan biaya kontruksi dengan metode penjadwalan dan penyusunan anggaran biaya berdasarkan harga satuan pekerja (HSPK) 2013. Perhitungan penjadwalan diperoleh dari produksi peralatan perhitungan kapasitas tenaga kerja untuk pekerjaan tertentu seperti struktur balok, kolom, dan pelat. Berdasarkan hasil analisa perhitungan biaya dan waktu pelaksanaan diperoleh biaya total untuk struktur beton sebesar Rp 8,922,700,000.00 dengan waktu pelaksanaan proyek 193 hari sedangkan biaya total untuk struktur baja sebesar Rp 15,075,700,000.00 dengan waktu pelaksanaan proyek 165 hari. ========================================================================================================== University of Trunojoyo Madura is located in Bangkalan, Madura. The building uses reinforced concrete construction (existing) that has 4 (four) floor with an area of 884 m 2 and wide flange steel frame for the roof structure. In 2013, the building was re-planned using steel profiles on the main structure, while the roof structure using elbow steel profiles. This final project aims to compare the cost and time of reinforced concrete structure with steel structures. In this final project, a reference to calculate the ratio of the implementation time and cost of construction by using the method of scheduling and budgeting based on the unit price (HSPK) 2013. Calculation of scheduling obtained from the production equipment capacity for each jobs such as structural beams, columns, and plate. Based on analysis of the calculation of costs and implementation time earned total costs for concrete structures Rp 8,922,700,000.00 with project duration 193 days, while total cost for the steel structure Rp 15,075,700,000.00 with project duration 165 days.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 692.5 Moc p 3100016066766
Uncontrolled Keywords: Rencana anggaran biaya, Metode pelaksanaan, Penjadwalan proyek, Gedung struktur baja, Gedung struktur beton, The budget cost, method of implementation, project scheduling, steel structure building, concrete structures building.
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Depositing User: - Davi Wah
Date Deposited: 28 Feb 2020 08:40
Last Modified: 28 Feb 2020 08:40
URI: http://repository.its.ac.id/id/eprint/75191

Actions (login required)

View Item View Item