Analisis Risiko Terhadap Biaya, Waktu, Dan Mutu Proyek Konstruksi Interior Hotel A Di Kota Sorong

Bestaria, Nurjannah (2023) Analisis Risiko Terhadap Biaya, Waktu, Dan Mutu Proyek Konstruksi Interior Hotel A Di Kota Sorong. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032201190-Master_Thesis.pdf] Text
6032201190-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2025.

Download (2MB) | Request a copy

Abstract

Industri pariwisata menjadi andalan dalam menghasilkan devisa dan juga telah berkembang menjadi industri terbesar di dunia. Untuk menunjang hal tersebut, saat ini perkembangan pembangunan proyek konstruksi di Indonesia terus bergerak maju terlihat banyak dilakukannya pembangunan infrastruktur, dimana salah satunya adalah Kota Sorong. Pemerintah menjadikan Sorong, Papua Barat, sebagai salah satu wilayah di Indonesia yang akan dibangun untuk mendukung sektor pariwisata. Pembangunan yang hingga saat ini masih terus dilakukan menjadikan Sorong menjadi kota dalam proses perkembangan. Sektor pariwisata di Kota Sorong saat ini menjadi tumpuan pembangunan, salah satunya adalah pembangunan Hotel. Perkembangan pembangunan proyek konstruksi di Kota Sorong ini tentunya tidak terlepas dari masalah-masalah yang dapat menghambat tercapainya tujuan proyek konstruksi yang mencakup biaya, waktu, dan mutu. Risiko pada proyek konstruksi tidak dapat dihilangkan tetapi dapat dikurangi atau didistribusikan dari satu pihak ke pihak lain. Oleh karena itu, dalam suatu proyek konstruksi perlu adanya analisis risiko dari manajemen proyek sebagai upaya penanganan kejadian tak terduga dan untuk pencapaian tujuan keberhasilan proyek. Penelitian ini dilakukan dengan metode penelitian studi kasus yang merupakan salah satu jenis penelitian kualitatif deskriptif. Dalam penelitian ini didapatkan variabel risiko dengan tingkat tertinggi variabel risiko yang berasal dari kategori risiko personal, risiko teknik dan risiko finansial. Pada proyek kontruksi imterior Hotel A, dari hasil FGD yang dilakukan untuk memberikan respon terhadap 30 variabel yang berpengaruh, maka respon probabilitas pada 3 variabel dengan menerima risiko dan respon probabilitas untuk 27 variabel yang lainnya dengan mengurangi risiko.
===============================================================================================================================
The tourism industry is a mainstay in generating foreign exchange and has also developed into the largest industry in the world. To support this, currently the development of construction development projects in Indonesia continues to move forward, it can be seen that many infrastructure developments are being carried out, one of which is the City of Sorong. The government has made Sorong, West Papua, one of the areas in Indonesia that will be developed to support the tourism sector. Development, which is still ongoing, has made Sorong a city in the process of development. The tourism sector in Sorong City is currently the foundation of development, one of which is the construction of hotels. The development of construction projects in Sorong City is certainly not free from problems that can hinder the achievement of construction project objectives which include cost, time and quality. Risks in construction projects cannot be eliminated but can be reduced or distributed from one party to another. Therefore, in a construction project, it is necessary to have a risk analysis from project management as an effort to handle unexpected events and for the purpose of project delivery. This research was conducted with a case study research method which is one type of descriptive qualitative research. In this study, risk variables with the highest level of risk variables were obtained from the categories of personal risk, technical risk and financial risk. In the Hotel A exterior construction project, from the results of the FGD conducted to provide a response to 30 influential variables, the probability response to 3 variables by accepting the risk and the probability response to 27 other variables by reducing the risk.

Item Type: Thesis (Masters)
Uncontrolled Keywords: risk analysis, risk response, interior construction, analisis risiko, respon risiko, konstruksi interior.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Nurjannah Bestaria
Date Deposited: 14 Feb 2023 09:39
Last Modified: 14 Feb 2023 09:39
URI: http://repository.its.ac.id/id/eprint/97394

Actions (login required)

View Item View Item