Pangestika, Selly Widya (2019) Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Swiss Bel Hotel Gilingan Solo. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111815000046-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (9MB) | Request a copy |
Abstract
Swiss Bel Hotel Gilingan Solo dibangun di Jalan Ahmad Yani depan Pasar Ngudi Rejeki Gilingan sebelah timur terminal Tirtonadi. Tugas akhir ini menggunalan bangunan ini untuk merencanakan waktu dan biaya pelaksanaan dengan batasan yaitu hanya menghitung struktur utama dari bangunan ini. Sebelum menghitung biaya pelaksanaan, terlebih dahulu harus diketahui produktivitas dari setiap pekerjaan (Pekerjaan bekisting, pembesian, dan pengecoran) kemudian menghitung durasi pekerjaan tersebut. Tugas akhir ini menggunakan referensi dari buku Ir. Soedrajat dengan judul Modern Analisis Anggaran Biaya Konstruksi dan data konstruksi dari beberapa sumber. Sebelum menghitung durasi pekerjaan, terlebih dahulu harus dihitung kebutuhan volume bekisting, pembesian dan pengeceroan. Kemudian menentukan jumlah pekerja tiap jenis pekerjaan. Setelah diketahui durasi maka akan dapat dihitung biaya pelaksanaan. Dalam menghitung durasi total pekerjaan harus memahami keterkaitan antara pekerjaan satu dengan pekerjaan yang lainnya. Hal ini dimaksudkan agar waktu yang diberikan dapat digunakan secara maksimal tanpa adanya kekosongan sehingga dapat menekan biaya pengeluaran untuk pelaksanaan. Perhitungan biaya pelaksanaan menggunakan acuan Harga Satuan Pokok Kegiatan (HSPK) Kota Solo tahun 2019 dan daftar harga bahan dan material sesuai dengan di lapangan. Berdasarkan perhitungan diperoleh biaya sebesar Rp Rp 35,411,487,456.33 dengan total durasi pekerjaan yaitu 220 hari kerja.
=================================================================================================================================
Swiss-Bel Hotel Gilingan Solo was built on Ahmad Yani Street in front of Ngudi Rejeki Gilingan Market, east of Tirtonadi bus station. This final project uses this building to plan the time and cost of implementation with limits, which only calculates the main structure of this building. Before calculating implementation costs, it must first be known the productivity of each job (Formwork, steelwork, and casting work) then calculate the duration of the work. This final project uses references from Ir. Soedrajat book with the title of Modern Construction Cost Budget Analysis and get construction data from several sources. Before calculating the duration of work, we must first calculate the volume requirements for formwork, production and offshore. Then determine the number of workers for each type of work. After the duration is known, the implementation costs will be calculated. In calculating the total duration of work must understand the relationship between work one with another job. This is intended so that the time given can be used optimally without any vacancy so that it can reduce the cost of spending for implementation. Implementation cost calculation uses the Solo City Principal Unit Price (HSPK) reference in 2019 and the price list of materials and materials according to the field. Based on the calculation obtained a fee of Rp 35,411,487,456.33 with a total duration of work which is 220 working days.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | duration, implementation cost, HSPK, waktu pelaksanaan, biaya pelaksanaan |
| Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
| Divisions: | Faculty of Vocational > 22401-Civil Infrastructure Engineering (D3) |
| Depositing User: | Selly Widya Pangestika |
| Date Deposited: | 11 Aug 2026 01:58 |
| Last Modified: | 11 Aug 2026 01:58 |
| URI: | http://repository.its.ac.id/id/eprint/66185 |
Actions (login required)
![]() |
View Item |