Sanjaya, Vicky (2007) Analisa Produktivitas Kerja Normal Dan Lembur (Studi Kasus Pekerjaan Pemasangan Bata Pada Pabrik PT. Sinar Sosro). Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
9105202402-Master_thesis.pdf Download (33MB) |
Abstract
Produktivitas dalam pekerjaan konstruksi, khususnya pekerjaan pemasangan bata, sangat dibutuhkan oleh kontraktor, konsultan, maupun pemilik proyek dalam membuat rencana anggaran biaya. Strategi yang digunakan untuk meningkatkan produktivitas adalah dengan mengetahui faktor-faktor yang memengaruhi produktivitas itu sendiri, baik produktivitas pada jam kerja normal, yaitu pagi dan siang hari, maupun produktivitas pada waktu lembur. Penelitian ini dilakukan pada jam kerja normal pagi (pukul 08.00–12.00 WIB), jam kerja normal siang (pukul 13.00–16.00 WIB), dan jam kerja lembur (pukul 17.00–20.00 WIB). Untuk mengetahui faktor-faktor yang memengaruhi produktivitas, digunakan dua metode, yaitu analisis faktor dan analisis regresi berganda. Dari kedua metode tersebut dapat disimpulkan bahwa faktor yang mempunyai pengaruh terbesar terhadap produktivitas pada jam kerja pagi adalah pengalaman kerja, upah, kondisi kesehatan, aktivitas merokok, tingkat pendidikan, dan frekuensi pulang kampung. Pengaruh terbesar terhadap produktivitas pada jam kerja siang adalah pengalaman kerja, upah, kondisi kesehatan, dan aktivitas merokok. Sementara itu, pengaruh terbesar terhadap produktivitas pada jam kerja lembur adalah pengalaman kerja, upah, kondisi kesehatan, aktivitas merokok, umur, status perkawinan, waktu istirahat makan, pengalaman di proyek, dan asal pekerja. Rata-rata produktivitas pada jam kerja pagi, siang, dan lembur masing-masing adalah 1,42 m²/jam, 1,24 m²/jam, dan 1,20 m²/jam. Harga pemasangan bata pada jam kerja pagi sebesar Rp3.521,00 per m², sedangkan pada jam kerja siang sebesar Rp4.032,00 per m². Untuk jam kerja lembur, dengan memperhatikan ketentuan Undang-Undang Ketenagakerjaan, biaya pemasangan bata sebesar Rp6.250,00 per m². Model umum produktivitas tukang dalam pekerjaan pemasangan bata menggunakan analisis regresi adalah Y (produktivitas) = 1,42 + 0,0535 Faktor 1 – 0,184 Faktor 5 – 0,223 Faktor 6. Faktor 1 merupakan bentukan dari variabel pengalaman kerja, penilaian supervisor, upah/gaji, kondisi kesehatan, dan aktivitas merokok. Sementara itu, Faktor 5 dan Faktor 6 merupakan variabel dummy untuk jam kerja siang dan lembur.
=================================================================================================================================
Productivity in construction work, particularly brick installation, is very important for contractors, consultants, and project owners when preparing project cost estimates. A strategy to improve productivity is to identify the factors that influence productivity during normal working hours, both in the morning and afternoon, as well as during overtime. This research was conducted during normal morning working hours (8:00 a.m.–12:00 p.m.), normal afternoon working hours (1:00 p.m.–4:00 p.m.), and overtime working hours (5:00 p.m.–8:00 p.m.). Two methods were used to identify the factors affecting productivity: factor analysis and multiple regression analysis. The results of both methods showed that the factors with the greatest influence on productivity during morning working hours were work experience, wages, health condition, smoking activity, education level, and frequency of returning home. The factors with the greatest influence on afternoon productivity were work experience, wages, health condition, and smoking activity. Meanwhile, the factors with the greatest influence on overtime productivity were work experience, wages, health condition, smoking activity, age, marital status, meal breaks, project experience, and workers' place of origin. The average productivity during morning, afternoon, and overtime working hours was 1.42 m²/hour, 1.24 m²/hour, and 1.20 m²/hour, respectively. The average cost of brick installation during morning working hours was Rp3,521.00 per m², while the cost during afternoon working hours was Rp4,032.00 per m². For overtime work, taking into account the provisions of the Labor Law, the cost of brick installation was Rp6,250.00 per m². The general productivity model for brick installation workers based on regression analysis is Y (productivity) = 1.42 + 0.0535 Factor 1 – 0.184 Factor 5 – 0.223 Factor 6. Factor 1 consists of work experience, supervisor assessment, wages/salary, health condition, and smoking activity. Meanwhile, Factors 5 and 6 are dummy variables representing afternoon and overtime working hours, respectively.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Produktivitas, Pekerjaan Pemasangan Bata, Analisa Faktor, Analisa Regresi Berganda, Productivity, Brick Installation, Factor Analysis, Multiple Regression Analysis |
| Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
| Divisions: | Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis |
| Depositing User: | magang . |
| Date Deposited: | 16 Sep 2026 07:30 |
| Last Modified: | 16 Sep 2026 07:30 |
| URI: | http://repository.its.ac.id/id/eprint/144568 |
Actions (login required)
![]() |
View Item |