Radityo, Fahreza Rahman (2022) Perhitungan Waktu dan Anggaran Biaya Pelaksanaan Proyek Perpustakaan Digital UINSA Surabaya, Jalan Raya Ahmad Yani No. 117 Kota Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111510000050-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (15MB) |
Abstract
Proyek Pembangunan Perpustakaan Digital UINSA Surabaya terletak di jalan Ahmad Yani no. 117Jemur Wonosari, Surabaya, merupakan salah satu pengembangan fasilitas Universitas Islam Sunan Ampel dengan instansi Kementerian Agama Republik Indonesia. Perpustakaan Digital UINSA memiliki luasan total 43.290m². Proyek pembangunan gedung ini dikerjakan oleh PT. Papan Inti Management yang dimana Bangunan ini memiliki lantai yaitu 2 lantai untuk lobby dan administrasi, 3 lantai untuk ruang arsipl, 2 lantai unuk kegiatan perkuliahan 2 lantai untung ruang auditorium, dan 1 lantai atap. Dalam melakukan perhitungan analisa biaya dan waktu pada pembangunan proyek ini dilakukan dengan menentukan item pekerjaan terlebih dahulu lalu menghitung volume dan pemilihan metode yang efisien sehingga menghasilkan durasi, penyusunan jadwal pekerjaan dan biaya total pada proyek ini, untuk biaya pelaksanaan menggunakan peraturan dan harga yang berlaku di kota Surabaya . Pada hasil akhir perhitungan biaya dan waktu pada proyek ini disusun dengan memadukan hasil dari network planning dan penjadwalan yang dibantu dengan software Microsoft Project sehingga dapat menghasilkan Kurva S yang optimal pada pembangunan proyek ini, selain itu disertai juga rekapitulasi biaya pelaksanaan proyek dan metode pelaksanaan yang digunakan. Perhitungan biaya pelaksanaan akan dibandingkan dengan hasil perhitungan Rencana Anggaran Biaya dari kontraktor. Sedangkan perhitungan waktu pelaksanaan menggunakan Analisa network planning dan kurva S untuk mengoptimalkan total durasi pelaksanaan yang terhitung sesuai metode pelaksanaan yang sudah direncanakan. Sehingga hasil perhtingan Biaya Rencana Anggaran Pelaksanaan adalah Rp23.908.196.427 dan total waktu pelaksanaan adalah 365 hari.
==================================================================================================================================
The construction Project of Digital Library Uiversitas Islam Sunan Ampel Surabaya which is located on Ahmad Yani Str. 117, Jemur Wonosari Surabaya is one of the Universitas Islam Sunan Ampel Surabaya’s facilty masterplan development by collaborating with The Ministry of Religion Republic of Indpnesia. UINSA Digital Library building has total area of 43,290 m2. This building construction is being worked on by Papan Inti Management as the general contractor. This building has one basement level, 1 basement level for lobby, 3 level for archive and data storage, 2 level for classroom activity, 2 level for auditorium, and 1 top level. In the process of calculating and analysis of the Time and Budget plan on this project, the first step of the process is by calculating the volume of the all the construction item based on the data,defining the method of the construction of each construction item, calculating the duration of each method of the construction, defining the duration and productivity of each construction method, arranging and setting the list of duration and budget total based on the set price by Indonesia and Surabaya Government. In the end of the result of calculating time and budget plan of construction, we need to check the efficiency of the duration with Network planning, and MS Project in order to make S Curve to determine the optimum result of the calculation based on the analysis. The calculation result would be checked and compare with the calculation done by the general consultant that handling the management of the construction project. And by using the S curve and network planning we can accumulate the total duration with effective result. And comparing the total calculation with the Time and Budget Plan done by the General Consultant. Thye result of the Calculation is Rp 23.908.196.427 and the total duration is 365 days.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | biaya dan waktu pelaksanaan, penjadwalan, kurva S, Time and Construction Budget Calculation, S Curve, Scheduling |
| Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
| Divisions: | Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4) |
| Depositing User: | magang . |
| Date Deposited: | 23 Jul 2026 03:33 |
| Last Modified: | 23 Jul 2026 03:33 |
| URI: | http://repository.its.ac.id/id/eprint/137336 |
Actions (login required)
![]() |
View Item |