Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Gedung Kuliah Bersama Universitas Negeri Malang

Aqila, Putri Vira Nikma (2022) Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Gedung Kuliah Bersama Universitas Negeri Malang. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201034-Undergraduate_Thesis.pdf] Text
2035201034-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

Dalam suatu kegiatan konstruksi diperlukan suatu manajemen atau pengelolaan yang dituntut memiliki kinerja, kecermatan, ketelitian, kecepatan, keamanan, dan keselamatan kerja yang tinggi untuk dapat memperoleh hasil yang efektif dan efisien. Biaya dan waktu dalam pekerjaan konstruksi dipengaruhi oleh metode yang digunakan dalam pekerjaan tersebut. Kedua hal tersebut saling berkaitan satu sama lain. Jika pekerjaan direncanakan untuk diselesaikan dalam waktu yang lebih cepat, maka dibutuhkan biaya yang lebih besar serta metode pelaksanaan yang tepat.
Dalam penyusunan tugas akhir ini membahas tentang perhitungan waktu dan biaya pelaksanaan Proyek Pembangunan Gedung Kuliah Bersama Universitas Negeri Malang mulai dari lantai 1 sampai dengan lantai 9\. Pada proses pelaksanaan proyek pembangunan terjadi pandemi COVID-19 yang menyebabkan pembengkakan biaya proyek. Oleh karena itu, penulis mencoba melakukan efisiensi dengan mengubah jumlah tenaga kerja dan jumlah alat yang digunakan. Perhitungan biaya pelaksanaan ditentukan berdasarkan volume setiap item pekerjaan, kemudian diperlukan perhitungan upah pekerja, biaya sewa alat berat, serta harga material. Dari hasil perhitungan tersebut, dapat disusun Rencana Anggaran Pelaksanaan (RAP) dan dihitung bobot setiap pekerjaan. Selanjutnya, hasil perhitungan waktu dan biaya digunakan untuk menyusun kurva-S.
Hasil dari proyek akhir ini berupa durasi pelaksanaan proyek, rekapitulasi biaya, metode pelaksanaan yang digunakan, serta kurva-S. Berdasarkan hasil analisis, diperoleh durasi pekerjaan selama 267 hari kerja dengan biaya pelaksanaan sebesar Rp49.649.639.209,21.
=================================================================================================================================
In a construction activity, management is required to have high performance, accuracy, precision, speed, security, and occupational safety in order to obtain effective and efficient results. Furthermore, the cost and time of construction work are influenced by the methods used in the work. These two aspects are interrelated. If the work is planned to be completed quickly, it will require higher costs and an appropriate construction method. In addition, the effectiveness of the construction method is also influenced by human resources and the availability of sophisticated equipment.
In the preparation of this final project, the calculation of the time and cost of the Joint Lecture Building Project at Universitas Negeri Malang is discussed, covering the construction from the 1st floor to the 9th floor. During the implementation of the construction project, the COVID-19 pandemic occurred, resulting in project cost overruns. Therefore, the author attempted to improve efficiency by adjusting the available workforce and equipment. The calculation of implementation costs was determined based on the work volume of each work item, including workers' wages, heavy equipment rental costs, and material prices. Based on these calculations, an Implementation Budget Plan (RAP) was prepared, and the weight of each work item was calculated. The final result of the time and cost calculations was presented in the form of an S-curve.
The results of this final project include the project implementation duration, cost recapitulation, construction methods used, and the S-curve. Based on the analysis results, the project duration was 267 working days, with an implementation cost of Rp49,649,639,209.21.

Item Type: Thesis (Other)
Additional Information: 692.5 Aqi p-1
Uncontrolled Keywords: Perhitungan biaya, waktu pelaksanaan, rencana anggaran pelaksanaan (RAP) , metode pelaksanaan., Cost calculation, implementation time, implementation budget plan (RAP), implementation method
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4
Depositing User: magang .
Date Deposited: 29 Sep 2026 07:24
Last Modified: 29 Sep 2026 07:24
URI: http://repository.its.ac.id/id/eprint/145024

Actions (login required)

View Item View Item