Analisis Faktor Penyebab Delay Ditinjau dari Proses Pra-Pemilihan Penyedia Jasa Bidang Konstruksi di PT XYZ

Kusumawardani, Aniek (2023) Analisis Faktor Penyebab Delay Ditinjau dari Proses Pra-Pemilihan Penyedia Jasa Bidang Konstruksi di PT XYZ. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211950025013-Master_Theisis.pdf] Text
09211950025013-Master_Theisis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (2MB) | Request a copy

Abstract

Pada keterlambatan proyek konstruksi, penting untuk dilakukan identifikasi faktor-faktor penyebab keterlambatan proyek konstruksi karena dampak yang signifikan terhadap manajemen proyek secara keseluruhan. Penelitian ini bertujuan untuk menganalisis faktor penyebab keterlambatan dalam proses pra-pemilihan penyedia jasa konstruksi di PT XYZ. Dalam penelitian ini, proses pra-pemilihan penyedia jasa akan dilakukan sebagai fokus utama, karena proses ini memiliki peran krusial dalam menentukan apakah suatu proyek akan mengalami keterlambatan atau tidak. Latar belakang penelitian menunjukkan bahwa sebagian besar proyek di PT XYZ mengalami keterlambatan selama periode tahun 2018 hingga awal tahun 2020. Metode penelitian yang akan digunakan adalah metode SEM-PLS dan uji statistik yang meliputi uji validitas dan reliabilitas terhadap faktor-faktor penyebab keterlambatan yang terjadi. ditentukan berdasarkan data awal dan penelitian sebelumnya. Metode SEM-PLS dipilih untuk penelitian ini karena metode ini cocok untuk data responden yang tidak dapat diukur secara langsung. Dari hasil penelitian didapatkan dari keempat variabel yang ditentukan (kelengkapan administrasi, kesiapan finansial, kesiapan teknis, dan kesesuaian harga dan kualitas), semua valid sebagai pengaruh faktor keterlambatan, namun hanya ada satu variabel yang tidak signifikan yaitu kesiapan finansial.
==================================================================================================================================
On delays in construction projects, it is important to make requests for factors causing delays in construction projects because of their significant impact on overall project management. This study aims to analyze the factors causing delays in the pre-selection process of construction service providers at PT XYZ. In this study, the pre-selection process of service providers will be carried out as the main focus, because this process has a crucial role in determining whether a project will experience delays or not. The research background shows that most of the projects at PT XYZ experienced delays during the period 2018 to early 2020. The research method that will be used is the SEM-PLS method and statistical tests which include validity and reliability tests on the factors causing the delays that occur. determined based on preliminary data and previous research. The SEM-PLS method was chosen for this study because this method is suitable for respondent data that cannot be measured directly. From the research results obtained from the four specified variables (administrative completeness, readiness, technical readiness, and price and quality suitability), all of them apply as the influence of delay factors, but there is only one variable that is not significant, namely financial readiness.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Delay, Factors Causing Delay, Service Provider, Pre-Election, SEM-PLS, Faktor Penyebab Delay, Penyedia Jasa, Pra-Pemilihan
Subjects: T Technology > TH Building construction > TH11 Builders' and contractors' bulletins. Including prices, permits, etc.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Aniek Kusumawardani
Date Deposited: 28 Aug 2023 06:19
Last Modified: 28 Aug 2023 06:19
URI: http://repository.its.ac.id/id/eprint/104884

Actions (login required)

View Item View Item