Perbaikan Desain Stasiun Kerja Pada Pabrikasi Tulangan Baja Melalui Pendekatan Ergonomi (Studi Kasus : Proyek Cibitung-Cimanggis Tollways Seksi 2)

Dzakiyah, Hasna (2021) Perbaikan Desain Stasiun Kerja Pada Pabrikasi Tulangan Baja Melalui Pendekatan Ergonomi (Studi Kasus : Proyek Cibitung-Cimanggis Tollways Seksi 2). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02411740000043_Undergraduate.pdf] Text
02411740000043_Undergraduate.pdf
Restricted to Repository staff only

Download (7MB) | Request a copy

Abstract

Proyek Konstruksi memiliki risiko kecelakaan kerja yang cukup tinggi. Seringnya terjadi kecelakaan kerja diakibatkan oleh beban kerja berat yang menyebabkan adanya keluhan otot pada pekerja. Tujuan dari penelitian ini untuk mengetahui kondisi kerja yang meliputi postur dan posisi tubuh pekerja, stasiun kerja dan lingkungan yang mempengaruhi pada pabrikasi tulangan baja, merancang perbaikan metode kerja dan stasiun kerja pada bagian bending dan cutting, dan melakukan evaluasi pada stasiun kerja saat ini dan setelah dilakukan perbaikan. Metode yang dilakukan dalam penelitian ini adalah Rapid Entire Body Assissment (REBA) dan Rapid Upper Limb Assessment (RULA) untuk memvalidasi kondisi aktual yang dilakukan pekerja. Pada penelitian ini juga dilakukan perbaikan stasiun kerja untuk mengoptimalkan proses kerja melalui pendekatan ergonomi. Hasil penelitian menunjukkan bahwa, hasil pengolahan data menggunakan metode REBA dan RULA kondisi saat ini memiliki penilaian postur kerja dengan risiko yang tinggi pada ketiga proses kerja yaitu bending, cutting dan pemindahan hasil besi. Sedangkan pada proses kerja bending dan cutting dilakukan perbaikan posisi dan postur tubuh setelah pekerja mendapatkan informasi mengenai penerapan posisi dan postur tubuh yang benar sehingga menghasilkan penurunan penilaian REBA dan RULA. Hasil perbaikan dilihat dari pengukuran beban kerja melalui perhitungan konsumsi energi pekerja dan didapatkan bahwa beban kerja mengalami penurunan akibat jumlah material handling yang berkurang menjadi empat kali setelah dilakukan perbaikan desain stasiun kerja
=============================================================================================
Construction Projects have a fairly high risk of work accidents. Frequent accidents at work are caused by heavy workloads that cause muscle complaints in workers. The purpose of this study is to determine working conditions which include posture and body position of workers, work stations and the environment that affect steel reinforcement fabrication, design improvements to work methods and work stations in bending and cutting sections, and evaluate current and post work stations improvement. The methods used in this research are the Rapid Entire Body Assissment (REBA) and the Rapid Upper Limb Assessment (RULA) to validate the actual conditions carried out by workers. In this research, work station repairs were also carried out to optimize work processes through an ergonomic approach. The results showed that the results of data processing using REBA and RULA methods currently have a high risk assessment of work posture in the three work processes, namely bending, cutting and removal of metal products. Meanwhile, in the bending and cutting work processes, posture and position improvements were carried out after workers received information about the correct application of posture and position, resulting in a decrease in REBA and RULA's assessment. The results of the improvements are seen from the measurement of workload through the calculation of workers' energy consumption and it is found that the workload has decreased due to the reduction in the amount of material handling to four times after the work station design is improved.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Workstation Design Improvement, Ergonomic Approach, REBA, and RULA Perbaikan Desain Stasiun Kerja, Pendekatan Ergonomi, REBA, dan RULA
Subjects: T Technology > T Technology (General) > T55 Industrial Safety
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Hasna Dzakiyah
Date Deposited: 05 Mar 2021 13:41
Last Modified: 05 Mar 2021 13:41
URI: http://repository.its.ac.id/id/eprint/83626

Actions (login required)

View Item View Item