Perhitungan Waktu Pelaksanaan dan Rencana Anggaran Pelaksanaan Pada Graha BKI Jakarta Utara - Jakarta

Sudarno, Dana Karisma (2019) Perhitungan Waktu Pelaksanaan dan Rencana Anggaran Pelaksanaan Pada Graha BKI Jakarta Utara - Jakarta. Diploma thesis, Institut Sepuluh November.

[thumbnail of 10111815000040-Undergraduate_Theses.pdf]
Preview
Text
10111815000040-Undergraduate_Theses.pdf

Download (49MB) | Preview

Abstract

Graha BKI, berlokasi di Jalan Yos Sudarso Kav. 38 – 40 Tanjung Priuk, Jakarta Utara merupakan pengembangan lokasi kerja yang dimiliki oleh PT Badan Klasifikasi Indonesia (Persero), luas lahan ± 1.690 m2 dan luas bangunan ± 17.400 m2 (12 lantai) dengan konstruksi beton bertulang. Tugas akhir ini menggunakan bangunan ini untuk merencanakan biaya dan waktu pelaksanaan. Pada tahap konstruksi, setiap jenis pekerjaan harus diketahui produktivitas dan sumber daya yang diperlukan. Tugas akhir ini menggunakan referensi dari Ir. Soedrajat dengan judul Modern Analisis Biaya Konstruksi dan data konstruksi dari beberapa kontraktor. Jika setiap pekerjaan konstruksi dapat dijelaskan pergerakannya, baik tenaga kerja dan peralatannya maka durasi dan produktivitasnya dapat ditentukan. Biaya konstruksi adalah biaya total sumber daya selama durasi pelaksanaan dan ditambah dengan biaya material. Metode konstruksi yang akan digunakan tergantung pada kegiatan yang saling terkait pada konstruksi. Oleh karena itu metode yang dipilih pada konstruksi bangunan ini membutuhkan pengetahuan tentang kegiatan - kegiatan yang saling berhubungan, sehingga dapat ditentukan apakah kegiatan tersebut akan sejajar atau paralel dengan kegiatan yang lain. Penentuan sejajar atau parallel suatu kegiatan merupakan dasar dalam merancang metode konstruksi untuk seluruh kegiatan. Biaya konstruksi dapat ditentukan berdasarkan daftar harga dari harga Satuan Pokok kegiatan (HSPK) 2018 dan daftar harga sesuai di lapangan. Berdasarkan hasil dari Analisa perhitungan didapatkan waktu pelaksanaan 315 hari dengan total biaya konstruksi sebesar Rp 44.100.815.135,00.
=================================================================================================================================
Graha BKI, where on Yos Sudarso Kav. 38 – 40 Tanjung Priuk, North Jakarta which are owned by PT Badan Klasifikasi Indonesia (Persero), occupied area of ± 1.690 m2 and building area ± 17.400 m2 (12 stroreys) with reinforced concrete construction. This final project uses this building design to plan its construction cost and duration. In construction stage, every type of work must be known its productivity and resources required. Reference used in construction planning is very rare to find out. This final project uses reference from Ir. Sudrajat in Modern Analysis of Construction Cost and construction data from several contractors. If each activity in construction can be described its movement, both man power and equipment(s), then duration and productivity capacity can be determined. Construction cost is a total of resources cost during the construction duration and combined with material cost. Method of construction that will be used, depends on interrelated activities that involved in construction. Hence, chosen method of construction in building reinforced concrete multi stories building needs a knowledge of those interrelated activities, so that it can be determined whether an activity will be sequence or parallel to the other activity. Construction cost can be determined based on price list from HSPK (Unit price of main activity) 2018 and price list available in the market. Based on calculation, yielded a total construction time is 315 days with cost of IDR 44.100.815.135,00.

Item Type: Thesis (Diploma)
Additional Information: RSIS 692.5 Sud p-I-1 2019
Uncontrolled Keywords: Rencana anggaran pelaksanaan, waktu pelaksanaan
Subjects: T Technology > TF Railroad engineering and operation > TF193 Estimates, costs, etc.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Dana Karisma Sudarno
Date Deposited: 12 Jul 2023 03:47
Last Modified: 12 Jul 2023 03:47
URI: http://repository.its.ac.id/id/eprint/64070

Actions (login required)

View Item View Item