Analisa Percepatan Waktu Dan Perhitungan Biaya Dengan Menggunakan Metode Time Cost Trade Off Pada Proyek Jalan Tol Ruas Pasuruan – Probolinggo Seksi IV

Sutisna, Yahya Arif (2023) Analisa Percepatan Waktu Dan Perhitungan Biaya Dengan Menggunakan Metode Time Cost Trade Off Pada Proyek Jalan Tol Ruas Pasuruan – Probolinggo Seksi IV. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910010062-Undergraduate_Thesis.pdf] Text
10111910010062-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (3MB) | Request a copy

Abstract

Proyek konstruksi merupakan suatu rangkaian kegiatan yang dilakukan dengan lingkup pekerjaan, waktu dan biaya tertentu sesuai perjanjian antara pemilik proyek (owner) dengan pelaksana (kontraktor). Namun pada kenyataannya di lapangan, sering terjadi keterlambatan waktu pekerjaan yang tidak dapat dilaksanakan oleh pelaksana sesuai dengan waktu yang telah direncanakan. Keterlambatan tersebut tentu dapat dipicu oleh berbagai faktor. Pada tugas akhir ini dilakukan analisa waktu dan biaya yang optimum dengan mengaplikasikan metode time cost trade off untuk studi kasus proyek Jalan Tol Ruas Pasuruan Probolinggo Seksi IV. Analisis dilakukan untuk mempersingkat waktu proyek dengan penambahan biaya yang seminimal mungkin. Adapun alternatif percepatan yang dilakukan adalah dengan melakukan penambahan jumlaj alat berat yang digunakan serta penambahan jumlah pekerja yang ada. Pada proyek pembangunan jalan tol Pasuruan – Probolinggo seksi IV ini dimulai pada tanggal 26 Oktober 2020 dengan jangka waktu pelaksanaan 790 hari kalender atau direncanakan akan selesai pada tanggal 25 Desember 2022 mendatang. Namun hingga 6 November 2022 progres pembangunan masih berjalan sekitar 61,342% dimana seharusnya progres proyek saat ini sudah mencapai 93,264%. Dari analisa yang telah dilakukan, untuk menyelesaikan sisa pekerjaan yang ada, biaya yang dibutuhkan adalah sebesar Rp. 543.682.903.805, dengan pengurangan durasi selama 76 hari dari 231 hari menjadi 155 hari pada sisa pekerjaan.
=================================================================================================================================
A construction project is a series of activities carried out with a certain scope of work, time and cost according to the agreement between the project owner (owner) and implementer (contractor). However, in reality in the field, there is often a delay in the time the work is not carried out by the executor in accordance with the time that has been planned. The delay can of course be triggered by various factors. In this final project, an optimum time and cost analysis is carried out by applying the time cost trade off method for a case study of the Pasuruan Probolinggo Section IV Toll Road project. The analysis is carried out to shorten the project time with minimal additional costs. The alternative acceleration is to increase the number of heavy equipment used and increase the number of existing workers. Section IV of the Pasuruan - Probolinggo toll road construction project started on October 26 2020 with an implementation period of 790 calendar days or is planned to be completed on December 25 2022. However, until November 6, 2022, the construction progress was still running at around 61.342%, where the current project progress should have reached 93.264%. From the analysis that has been done, to complete the remaining work, the cost required is Rp. 543,682,903,805, with a reduction in duration of 76 days from 231 days to 155 days in the remainder of the work.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Proyek Jalan Tol, Time Cost Trade Off, Percepatan Waktu dan Biaya
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: YAHYA ARIF SUTISNA
Date Deposited: 05 Oct 2023 04:24
Last Modified: 17 Nov 2023 04:05
URI: http://repository.its.ac.id/id/eprint/102727