Yanti, Sonia Indah Nor (2023) Penerapan BIM Untuk Analisa Estimasi Biaya Proyek dan Penjadwalan Pada Proyek Pembangunan Gedung Kuliah Akuntansi/ Administrasi Niaga Politeknik Negeri Malang Menggunakan Aluminium Formwork. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Text
10111910010049-Undergraduate_Thesis for D4 program.pdf - Accepted Version Restricted to Repository staff only until 1 October 2025. Download (36MB) | Request a copy |
Abstract
Pesatnya perkembangan dan kebutuhan infrastruktur menuntut kegiatan proyek konstruksi berjalan dengan optimal. Salah satu upaya dalam penerapan konsep green building adalah inovasi dalam metode pelaksanaan bekisting yaitu penggunaan bekisting aluminium. Sistem Aluminium Formwork merupakan metode baru yang dikembangkan di Korea Selatan, dengan bahan utamanya menggunakan aluminium dalam bentuk puzzle untuk membentuk struktur cetakan. Setelah dibongkar, Aluminium Formwork dapat digunakan 150-200 kali. Koordinasi antar pihak yang terlibat menjadi keharusan dan hampir seluruh bidang pekerjaan sudah dilakukan dengan memanfaatkan penggunaan software. Perkembangan teknologi konstruksi tumbuh dari bentuk dokumen menjadi visualisasi tiga dimensi, kemudian berkembang dimensi lainnya terhadap biaya, waktu, jadwal, hingga dimensi seterusnya dan perkembangan inilah menjadi evolusi informasi teknologi yang kemudian disebut Building Information Modeling (BIM). Gedung Kuliah Akuntansi/Administrasi Niaga Politeknik Negeri Malang memiliki struktur lantai tipikal sehingga cocok dengan penggunaan Aluminium Formwork. Proyek akhir ini merencanakan penggunaan Aluminium Formwork mulai lantai 1 sampai lantai 8 dan atap untuk struktur kolom, shear wall, pelat, balok, serta tangga. Pada proyek akhir ini akan membahas tentang penerapan Building Information Modeling (BIM) untuk penjadwalan sesuai teori-teori yang berkaitan dengan waktu dan biaya. Dengan mengimplementasikan BIM 4D, dapat mengoptimalkan perencanaan waktu yang dibutuhkan dalam fase pelaksanaan konstruksi seperti waktu tunggu, waktu pemasangan, waktu pengeringan, dan lainnya dengan lebih efisien. BIM 4D, juga dapat digunakan sebagai fundamental untuk mengatasi dan mengelola masalah yang mungkin terjadi sejak tahap awal pengerjaan hingga penyelesaian. Seperti contoh dalam masalah keterlambatan kedatangan material. Metode bekisting aluminium pengimplementasian BIM dapat diselesaikan dengan durasi total 224 hari dengan Rencana Anggaran Pelaksanaan sebesar Rp29.971.896.000. Untuk metode bekisting konvensional pengimplementasian BIM dapat diselesaikan dengan durasi total 247 hari dengan Rencana Anggaran Pelaksanaan sebesar Rp28.020.508.431. Sedangkan metode bekisting konvensional dengan perhitungan manual dapat diselesaikan dengan durasi total 254 hari dengan Rencana Anggaran Pelaksanaan sebesar Rp28.730.487.000.
=================================================================================================================================
The rapid development and demand for infrastructure requires that construction project activities run optimally. One of the efforts in implementing the green building concept is innovation in formwork implementation methods, namely the use of aluminium formwork. The aluminium formwork system is a new method developed in South Korea, with the main material using aluminum in a puzzle shape to form the mold structure. After being disassembled, the aluminium formwork can be used 150-200 times. Coordination between the parties involved is a must and almost all fields of work have been carried out by utilizing the use of software. The development of construction technology grew from document form to three-dimensional visualization, then developed other dimensions in terms of cost, time, schedule, to the next dimension and this development became the evolution of information technology which was then called Building Information Modeling (BIM). The Malang State Polytechnic Accounting/Commerce Administration Lecture Building has a typical floor structure that makes it suitable for the use of aluminium formwork. This final project plans to use aluminium formwork from the 1st to the 8th floor and roof for column, shear wall, slab, beam, and staircase structures. This final project will discuss the application of Building Information Modeling (BIM) for scheduling according to theories related to time and cost. By implementing BIM 4D, you can optimize the planning time needed in the construction implementation phase such as waiting time, installation time, drying time, and others more efficiently. BIM 4D, can also be used as a fundamental to overcome and manage problems that may occur from the initial stages of work to completion. As an example in the matter of delays in the arrival of materials. The BIM aluminium formwork implementation method can be completed with a total duration of 224 days with an Implementation Budget Plan of IDR29.971.896.000. For conventional conventional BIM implementation methods, it can be completed with a total duration of 247 days with an Implementation Budget Plan of IDR28.020.508.431. Whereas the conventional formwork method with manual calculations can be completed with a total duration of 254 days with an Implementation Budget Plan of IDR28.730.487.000.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Aluminium Formwork, BIM, Estimasi Waktu, Estimasi Biaya, Tekla, Penjadwalan, Time Estimation, Cost Estimation, Schedulling |
Subjects: | T Technology > TH Building construction > TH437 Building--Cost control. T Technology > TH Building construction > TH438 Construction industry--Management. Project management. T Technology > TH Building construction > TH438.13 Building information modeling. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Sonia Indah Nor Yanti |
Date Deposited: | 05 Oct 2023 06:35 |
Last Modified: | 05 Oct 2023 06:35 |
URI: | http://repository.its.ac.id/id/eprint/103070 |
Actions (login required)
View Item |