Manajemen Pelaksanaan Konstruksi Terowongan Pengambilan (Intake) Pada Proyek Bendungan Jlantah Kabupaten Karanganyar, Jawa Tengah

Kinanti, Sekar Putri Budi (2023) Manajemen Pelaksanaan Konstruksi Terowongan Pengambilan (Intake) Pada Proyek Bendungan Jlantah Kabupaten Karanganyar, Jawa Tengah. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910020012-Undergraduate_Thesis.pdf] Text
10111910020012-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (29MB) | Request a copy

Abstract

Terowongan pengambilan adalah salah satu bagian dari bendungan yang berfungsi untuk pengambilan air tampungan waduk dilengkapi dengan pipa penstock atau pipa tekan untuk mengalirkan air tampungan agar bisa dimanfaatkan oleh masyarakat. Agar dapat mewujudkan bangunan tersebut menjadi nyata guna mencapai tujuan yang diinginkan maka diperlukan manajemen pelaksanaan konstruksi yang tepat karena kegiatan konstruksi memiliki hubungan yang saling berkaitan satu sama lain mulai dari menentukan metode pelaksanaan yang tepat, penentuan jumlah alat berat yang digunakan, durasi waktu pelaksanaan konstruksi, dan anggaran biaya yang dibutuhkan. Dengan adanya manajemen pelaksanaan konstruksi yang tepat maka konstruksi tersebut dapat mencapai tujuan yang direncanakan dan hasil yang dinginkan.Pada proyek akhir ini merencanakan manajemen pelaksanaan konstruksi pada terowongan pengambilan Bendungan Jlantah. Pengumpulan data yang dilakukan adalah gambar kerja, spesifikasi teknis proyek, HSPK Kabupaten Karanganyar, dan data penunjang lainnya. Dari data yang diperoleh dilakukan pengolahan data yaitu mengidentifikasi item pekerjaan, pembuatan metode pelaksanaan, kemudian dilakukan perhitungan volume tiap item pekerjaan, produktivitas alat berat, dan kebutuhan jumlah pekerja . Dari perhitungan tersebut digunakan untuk menentukan durasi dan rencana anggaran biaya. Untuk penyusunan penjadwalan proyek menggunakan metode preseden diagram menggunakan program bantu Microsoft Project. Dari perhitungan yang telah dilakukan maka didapatkan hasil akhir berupa Kurva S. Hasil analisa pembahasan dan perhitungan didapatkan kebutuhan alat berat yang digunakan, durasi waktu pelaksanaan konstruksi, network planning, dan kurva S. Didapatkan durasi waktu pelaksanaan proyek konstruksi terowongan pengambilan di Bendungan Jlantah selama 583 hari kalender dengan jam kerja efektif selama 7 jam kerja dengan rencana anggaran biaya sebesar Rp 12.829.335.000,00.
=================================================================================================================================
The intake tunnel is one part of the dam that functions for reservoir water collection equipped with a penstock pipe or pressure pipe to drain the reservoir water so that it can be used by local community. In order to realize the building to be real in order to achieve the desired goals, proper construction implementation management is needed because construction activities have an interrelated relationship with each other starting from determining the right implementation method, determining the number of heavy equipment used, the duration of construction implementation time, and the cost budget needed. With proper construction implementation management, the construction can achieve the planned goals and result as desired.In this final project, the management of construction implementation on the Jlantah Dam retrieval tunnel is planned. The data collection carried out is working shop drawing, technical specifications of the project, HSPK of Karanganyar Regency, and other supporting data. From the data obtained, data processing is carried out, namely identifying work items, making implementation methods, then calculating the volume of each work item, heavy equipment productivity, and the need for the number of workers. From these calculations are used to determine the duration and cost budget plan. For the preparation of project scheduling using the precedent diagram method using the Microsoft project auxiliary program. From the calculations that have been done, the final result is obtained in the form of an S Curve.The results of this study and calculation analysis obtained the needs of heavy equipment used, the duration of construction implementation time, network planning, and the S curve. The duration of the implementation of the retrieval tunnel construction project at the Jlantah Dam was obtained for 583 calendar days with effective working hours for 7 working hours with a budget plan of Rp 12.829.335.000,00.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Alat Berat, Kurva S, Manajemen Konstruksi, Metode Pelaksanaan, Rencana Anggaran Biaya, Heavy Equipment, S curve, Construction Management, Implementation Method, Cost Budget Plan
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Sekar Putri Budi Kinanti
Date Deposited: 18 Oct 2023 01:25
Last Modified: 18 Oct 2023 01:25
URI: http://repository.its.ac.id/id/eprint/103158

Actions (login required)

View Item View Item