Analisis Waktu dan Biaya Pelaksanaan pada Proyek Pembangunan Gedung Kuliah Jurusan Akuntansi dan Administasi Niaga Politeknik Negeri Malang Menggunakan Metode Hollow Core Slab

Riza, Fitri (2023) Analisis Waktu dan Biaya Pelaksanaan pada Proyek Pembangunan Gedung Kuliah Jurusan Akuntansi dan Administasi Niaga Politeknik Negeri Malang Menggunakan Metode Hollow Core Slab. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910010077-Undergraduate_Thesis.pdf] Text
10111910010077-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (18MB) | Request a copy

Abstract

Sistem beton pracetak merupakan salah satu alternatif metode konstruksi dalam perancangan struktur. Metode pracetak mulai banyak digunakan dalam konstruksi dikarenakan memiliki banyak kelebihan, diantaranya waktu pelaksanaan lebih cepat karena beton sudah keras, kualitas beton yang lebih terjamin karena kontrol mutu yang lebih baik, menjadikan tempat kerja lebih bersih, dan lebih produktif. Sistem pracetak untuk struktur pelat salah satunya adalah Hollow Core Slab, yaitu pelat pracetak pratekan yang terdapat rongga di dalamnya yang berguna untuk memperingan struktur. Penyusunan proyek akhir merencanakan manajemen Konstruksi pada Proyek Pembangunan Gedung Perkuliahan Jurusan Akuntansi dan Administasi Niaga Politeknik Negeri Malang bertempat di Jl. Soekarno – Hatta No. 9, Kel. Jatimulyo, Kec. Lowokwaru, Kota Malang, Jawa Timur. Proyek ini terdiri dari 8 lantai ditambah lantai rooftop. Proyek ini menggantikan metode cor konvensional pada pelat menjadi beton precast Hollow Core Slab. Hal tersebut dilakukan karena proyek memiliki lantai tipikal serta dapat mempercepat pekerjaan struktur. Penyusunan proyek akhir dimulai dari mengidentifikasi item pekerjaan kemudian menghitung volume dan produktivitas. Perhitungan tersebut akan menentukan durasi item pekerjaan yang selanjutnya digunakan untuk menyusun penjadwalan dengan alat bantu Microsoft project. Didapatkan hasil Analisa perhitungan wakti diperoleh selama 329 hari dan biaya pelaksanaan sebesar Rp26.276.384.851,00 sedangkan untuk metode cor konvensional diperoleh biaya pelaksanaan sebesar Rp26.276.384.851,00 dengan durasi 340 hari. Sehingga penggunaan HCS menghemat biaya pada pembangunan proyek lebih efektif 11 hari.
=================================================================================================================================
The precast concrete system is an alternative construction method in structural design. The precast method is starting to be widely used in construction because it has many advantages, including faster execution time because the concrete is already hard, more guaranteed concrete quality due to better quality control, making the workplace cleaner, and more productive. One of the precast systems for plate structures is the Hollow Core Slab, which is a prestressed precast plate that has a cavity in it which is useful for lightening the structure. Preparation of the final project planning Construction management in the Lecture Building Construction Project, Department of Accounting and Commerce Administration, State Polytechnic of Malang, located on Jl. Soekarno-Hatta No. 9, Ex. Jatimulyo, Kec. Lowokwaru, Malang City, East Java. This project consists of 8 floors plus a rooftop floor. This project replaces the conventional method of casting on slabs into precast concrete Hollow Core Slabs. This was done because the project has a typical floor and can speed up structural work. The preparation of the final project starts from identifying work items then calculating volume and productivity. This calculation will determine the duration of work items which are then used to arrange scheduling with Microsoft project tools. The results of the time calculation analysis obtained for 329 days and an implementation cost of Rp26.276.384.851,00 while for the conventional cast method, an implementation cost of Rp26.276.384.851,00 was obtained with a duration of 340 days. So that the use of HCS more effective project construction duration of 11 days.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Biaya Pelaksanaan, Hollow Core Slab, Waktu Pelaksanaan Proyek
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Fitri Riza
Date Deposited: 04 Dec 2023 06:18
Last Modified: 04 Dec 2023 06:18
URI: http://repository.its.ac.id/id/eprint/103283