Prayogo, Fristo Ari (2007) Sistem Alternatif Perencanaan Perkuatan Tanah Pada Timbunan Tinggi Overpass Mayangan, Probolinggo (Metode Kombinasi Geotextile-Sheetpile Dan Geogrid-Box Culvert). Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.
Text
3101100052-Undergraduate_Thesis.pdf - Accepted Version Download (16MB) |
Abstract
Overpass adalah bagian dari fly over yang merupakan terusan dari 2 ujung fly over. Overpass merupakan salah salu cara untuk menanggulangi permasalahn lalu lintas yang terjadi saai ini. Pembangunan timbunan tinggi pada overpass Mayangan ini diperlukan perencanaan yang matang dan perencanaan yang tepat Hal itu dikarenakan konstruksinya yang sangat tinggi. Konstruksi tersebut memiliki dimensi Panjang = ± 140 m, L = 20 m, ± 10 m, timbunan tegak 90 °, lokasinya berada di sekitar Pelabuhan Mayangan Probolinggo. Pada penulisan tugas akhir ini akan direncanakan dengan 2 altematif timbunan yaitu : struktur Goegrid- Box culvert, kombinasi Sheet Pile dan Geotextile; pada timbunan tidak digunakan granular soil, tetapi menggunakan beberapa komposisi tanah urugan tanah. Serta chlakukan perhitungan konsolidasi tanah dasar dengan menggunakan PVD dan preloading untuk mempercepat waktu konsolidasi selam itu juga dihitung Rencana Anggaran Biaya dari tiap-tiap altematif guna menganalisa biaya, dan pelaksanaan dari altematif manakah yang paling proporsional untuk dilaksanakan „ Dari analisa didapatkan untuk altematif 1 dengan kombinasi sheet pile dengan geotextile dibutuhkan biaya sebesar Rp 7.933.930.09.7 yang terdiri dari jenis Pekerjaan Tanah, pemasangan sheet pile dan perkuatan tanah.untuk alternative 2 kombinasi struklur geogrid dan box culvert dibutuhkan biaya sebesar Rp. 5.361.562.234.88 yang terdiri dari jenis Pekerjaan Tanah, pemancangan minipile.pengecoran box culvert dan perkuatan tanah
===================================================================================================================================
An overpass is part of a fly over which is a continuation of the 2 ends of the fly over. Overpass is one way to overcome the current traffic problems. The construction of high embankments on the Mayangan overpass requires careful planning and precise planning. This is because the construction is very high. The construction has dimensions Length = ± 140 m, L = 20 m, ± 10 m, vertical embankment 90 °, its location is around Mayangan Harbor, Probolinggo. In writing this final project, 2 alternative piles will be planned, namely: Goegrid-Box culvert structure, a combination of Sheet Pile and Geotextile; In embankments, granular soil is not used, but several soil compositions are used for embankment. As well as carrying out basic soil consolidation calculations using PVD and preloading to speed up the submersible consolidation time, the Cost Budget Plan for each alternative is also calculated to analyze the costs, and the implementation of which alternative is the most proportional to be implemented „ From the analysis it is obtained for alternative 1 with a combination sheet pile with geotextile requires a cost of Rp. 7,933,930,09.7 which consists of Earthwork, sheet pile installation and soil reinforcement. For alternative 2, the combination of geogrid and box culvert structures requires a cost of Rp. 5,361,562,234.88 which consists of earthworks, minipile erection, box culvert casting and soil reinforcement
Item Type: | Thesis (Other) |
---|---|
Additional Information: | RSS 624.151 363 Pra s-1 2007 |
Uncontrolled Keywords: | Timbunan tinggL Geogrid.Geotextile.Sheet Pile, 5 PVD, Box culvert, dan biaya pelaksanaan.; High Embankment Geogrid, Geotextile.Sheetpile.PVD.Box Culvert, and cost estimated |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA749 Soil stabilization |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | EKO BUDI RAHARJO |
Date Deposited: | 27 Oct 2023 08:30 |
Last Modified: | 27 Oct 2023 08:30 |
URI: | http://repository.its.ac.id/id/eprint/105011 |
Actions (login required)
View Item |