Analisis Pelaksanaan Proyek Pembangunan Tower 2 ITS Menggunakan Critical Path Method-CPM (Studi Kasus-Pondasi Pada Tower 2 ITS)

Rohmariyanti, Nabila (2024) Analisis Pelaksanaan Proyek Pembangunan Tower 2 ITS Menggunakan Critical Path Method-CPM (Studi Kasus-Pondasi Pada Tower 2 ITS). Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 06111740000086-Undergraduate_Thesis.pdf] Text
06111740000086-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (895kB) | Request a copy

Abstract

Meningkatnya peminat calon mahasiswa Institut Teknologi Sepuluh Nopember menjadi alasan adanya pembangunan yang dilakukan oleh manajemen kampus Institut Teknologi Sepuluh Nopember. Pembangunan ini dilakukan guna untuk meningkatkan fasilitas belajar mengajar agar para mahasiswa merasa nyaman dalam menjalani aktifitas di dalam kampus. Berdasarkan hal tersebut untuk membangun sarana belajar yang ideal, dan agar proyek pembangunan dapat selesai sesuai target, hal yang harus dilakukan adalah mengerjakan perencanaan dengan baik sesuai manajemen konstruksi, khususnya mengenai penjadwalan proyek. Penjadwalan penting untuk menentukan kegiatan yang harus dilakukan dan mengatur urutan serta waktu untuk menyelesaikan kegiatan sebuah proyek. Dan salah satu cara yang dapat dilakukan terkait hal ini adalah menggunakan metode CPM (Critical Path Method) sehingga meningkatkan produktivitas dan efisiensi proyek. Penelitian ini bertujuan untuk menganalisa pengerjaan proyek pembangunan Tower 2 Institut Teknologi Sepuluh Nopember untuk mendapatkan waktu optimum penyelesaian proyek menggunakan metode CPM (Critical Path Method) khususnya pada pondasi. Dimana, pondasi merupakan bagian yang sangat penting pada suatu bangunan apalagi bangunan tinggi. Pada metode CPM ini dilakukan analisis kegiatan mana saja yang termasuk ke dalam jalur lintasan kritis agar didapatkan durasi optimal untuk metode tersebut. Dengan metode CPM ini dihasilkan waktu pengerjaan pondasi yang memiliki lintasan kritis adalah 27 hari.
=============================================================================================================================
The increasing interest in prospective students from Institut Teknologi Sepuluh Nopember is the reason for the development being carried out by the campus management of Institut Teknologi Sepuluh Nopember. This development was carried out to improve teaching and learning facilities so that students feel comfortable in carrying out activities on campus. Based on this, to build ideal learning facilities, and so that construction projects can be completed according to target, what must be done is to plan well according to construction management, especially regarding project scheduling. Scheduling is important for determining the activities that must be carried out and organizing the sequence and time to complete the activities of a project. One way that can be done regarding this is to use the CPM (Critical Path Method) method so that it will increase project productivity and efficiency. This research aims to analyze the work on the Tower 2 construction project at Institut Teknologi Sepuluh Nopember to obtain the optimum time for project completion using the CPM (Critical Path Method) method, especially for the foundation. Where, the foundation is a very important part of a building, especially a tall building. In this CPM method, an analysis of which activities are included in the critical path will be carried out to obtain the optimal duration for this method. With the CPM method, the construction time for the foundation with critical paths is 27 days.

Item Type: Thesis (Other)
Uncontrolled Keywords: Critical Path Method , Penjadwalan Proyek, Pondasi, Critical Path Method, Project Time Scheduling, Foundation
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Mathematics and Science > Mathematics > 44201-(S1) Undergraduate Thesis
Depositing User: nabila rohmariyanti
Date Deposited: 10 Feb 2024 19:42
Last Modified: 10 Feb 2024 19:42
URI: http://repository.its.ac.id/id/eprint/106731

Actions (login required)

View Item View Item