Silvianti, Alya (2024) Perhitungan Estimasi Waktu dan Rencana Anggaran Biaya Pelaksanaan Proyek Pembangunan Gedung Hotel Ibis 10 Lantai Kota Madiun Menggunakan Aluminium Formwork dan Perth Construction Hire (PCH). Other thesis, Institut Teknologi Sepuluh Nopember.
Text
2035221109-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 February 2026. Download (28MB) | Request a copy |
Abstract
Sebuah proyek konstruksi adalah kegiatan terbatas dalam waktu tertentu. Oleh karena itu, efektifitas dan efisiensi untuk manajemen konstruksi diperlukan untuk pengaturan sumber daya. Fokus dari proyek akhir ini adalah perencanaan manajemen konstruksi untuk Pembangunan Gedung Hotel Ibis 10 Lantai di Kota Madiun. Proyek ini melibatkan pekerjaan struktur untuk 10 lantai menggunakan Aluminium Formwork dan Perth Construction Hire (PCH) mulai dari lantai 2 hingga lantai 10. Pendekatan ini dipilih karena proyek memiliki lantai yang serupa dan dapat mempercepat proses konstruksi struktur. Keunggulan Perth Construction Hire (PCH) dibandingkan dengan perancah lainnya seperti scaffolding adalah kebutuhan alat yang diperlukan lebih sedikit. Sedangkan keunggulan dari Aluminium Formwork adalah bekisting ini bisa digunakan berulang (repetisi) sehingga memudahkan apabila dalam proyek yang memiliki lantai tipikal. Tahap awal proyek melibatkan identifikasi pekerjaan, perhitungan volume, dan produktivitas.
Penjadwalan menggunakan metode Precedence Diagram Method dan menghasilkan informasi tentang durasi, metode pelaksanaan, rencana anggaran pelaksanaan, dan kurva S. Analisis perhitungan untuk struktur atas lantai 2 – lantai 10 (atap) menunjukkan bahwa metode Aluminium Formwork memiliki durasi 145 hari kerja, dengan anggaran pelaksanaan sebesar Rp 13.746.777.657,62 sebelum PPN dan sesudah ditambahkan biaya K3 sebesar 1,5% dari nilai pekerjaan. Sedangkan PCH memiliki durasi 155 hari kerja, dengan anggaran pelaksanaan sebesar Rp 13.461.267.839. Sehingga, diperoleh selisih biaya total sebesar Rp 285.509.818,36 atau sebesar 2,12%.
===================================================================================================================================
A construction project is a limited activity within a certain time. Therefore, effectiveness and efficiency for construction management are needed for resource management. The focus of this final project is construction management planning for the construction of the 10-story Ibis Hotel Building in Madiun City.
This project involves structural work for 10th floors using Aluminum Formwork and Perth Construction Hire (PCH) from the 2nd floor to the 10th floor. This approach was chosen because the project has typical floors and can speed up the structure construction process. The advantage of Perth Construction Hire (PCH) compared to other scaffolding such as scaffolding is that it requires fewer tools. Meanwhile, the advantage of Aluminum Formwork is that this formwork can be used repeatedly (repetitively) making it easier for projects that have typical floors. The initial stages of a project involve job identification, volume calculations, and productivity.
Scheduling uses the Precedence Diagram Method and produces information about duration, implementation method, implementation budget plan, and S curve. Analysis of calculations for the structure above the 2nd floor - 10th floor (roof) shows that the Aluminum Formwork method has a duration of 145 working days, with an implementation budget amounting to IDR 13,746,777,657.62 before VAT and after adding K3 costs of 1.5% of the work value. Meanwhile, PCH has a duration of 155 working days, with an implementation budget of IDR 13,461,267,839. Thus, the total cost difference is IDR 285,509,818.36 or 2.12%.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Estimasi Waktu, Estimasi Biaya, Aluminium Formwork, Perth Construction Hire (PCH), Microsoft Project, Penjadwalan, Time Estimation, Cost Estimation, Aluminium Formwork, Perth Construction Hire (PCH), Microsoft Project, Scheduling |
Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Alya Silvianti |
Date Deposited: | 12 Feb 2024 00:27 |
Last Modified: | 12 Mar 2024 04:05 |
URI: | http://repository.its.ac.id/id/eprint/106899 |
Actions (login required)
View Item |