Pengambilan Keputusan Pada Pemilihan Supplier Di Proyek EPC Dengan Kombinasi Metode Gaussian Fuzzy AHP & Topsisi

Putra, I Gusti Agung (2024) Pengambilan Keputusan Pada Pemilihan Supplier Di Proyek EPC Dengan Kombinasi Metode Gaussian Fuzzy AHP & Topsisi. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032201094-Master_Thesis.pdf] Text
6032201094-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 July 2024.

Download (3MB) | Request a copy

Abstract

Pemilihan supplier. Bobot kriteria kemudian digunakan untuk menilai kinerja masing-masing supplier. Metode TOPSIS digunakan untuk menentukan supplier terbaik dengan nilai jarak terdekat dari ideal positif dan jarak terjauh dari ideal negatif. Penelitian ini dilakukan pada lingkup proyek EPC. Kriteria pemilihan supplier yang dipertimbangkan merupakan hasil FGD bersama narasumber. Hasil penelitian menempatkan bahwa harga merupakan kriteria tertinggi pada sistem pengambilan keputusan, diikuti oleh kapabilitas teknis dan durabilitas produk. Dalam pemilihan prioritas alternatif, PT Azbil menjadi alternatif pertama untuk pemilihan dengan kriteria dan bobot yang telah ditentukan
===================================================================================================================================
Supplier selection. The criteria weights are then used to assess the performance of each supplier. The TOPSIS method is used to determine the best supplier with the closest distance from the positive ideal and the farthest distance from the negative ideal. This research was conducted within the scope of the EPC project. The supplier selection criteria that are considered are the results of FGDs with resource persons. The research results show that price is the highest criterion in the decision making system, followed by technical capability and product durability. In selecting alternative priorities, PT Azbil became the first alternative for selection with predetermined criteria and weights

Item Type: Thesis (Masters)
Uncontrolled Keywords: Pemilihan supplier, metode Gaussian Fuzzy AHP, metode TOPSIS, proyek EPC; Supplier selection, Gaussian Fuzzy AHP method, TOPSIS method, EPC project
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.23 Decision making. Business requirements analysis.
H Social Sciences > HD Industries. Land use. Labor > HD39.5 Industrial procurement.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: I Gusti Agung Krisna Manggala Putra
Date Deposited: 13 Feb 2024 07:15
Last Modified: 13 Feb 2024 07:15
URI: http://repository.its.ac.id/id/eprint/107206

Actions (login required)

View Item View Item