Analisa Penyebab Keterlambatan Dan Overbudget Pada Proyek Konstruksi PT.WER

Rosyidin, Imam Faizal (2024) Analisa Penyebab Keterlambatan Dan Overbudget Pada Proyek Konstruksi PT.WER. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032212006-Master_Thesis.pdf] Text
6032212006-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (3MB) | Request a copy

Abstract

Proyek konstruksi sering dihadapkan pada tantangan keterlambatan dan overbudget, yang dapat menyebabkan peningkatan biaya operasional, kerugian finansial, penurunan reputasi, dan kehilangan kepercayaan klien. Penelitian ini fokus pada variabel yang memengaruhi keterlambatan dan overbudget di PT. WER menggunakan metode kualitatif dengan analisis regresi linier berganda serta Relative Important Index (RII). Hasil penelitian menunjukkan bahwa variabel yang paling berpengaruh terhadap keterlambatan dan overbudget di PT. WER melibatkan Tidak Tersedianya Dana Kerja Pada Proyek, Keterlambatan Pembayaran Kontraktor Kepada Rekanan (Vendor), Terdapat Perubahan Desain Dari Gambar Desain Awal, Terdapat Perbedaan Basic Design Dengan Kondisi Lapangan, Pembayaran Termin Dari Pemilik Pekerjaan Terlambat, dan Terdapat Kenaikan Harga Material. Solusi yang diusulkan pengelolaan keuangan yang efisien, perencanaan dan pengendalian yang lebih baik, manejemen risiko yang proaktif, peningkatan komunikasi dengan stakeholder, evaluasi kontrak dan klausa pembayaran, serta monitoring pasar material. Penelitian ini memberikan manfaat praktis dalam mengidentifikasi serta mengatasi masalah keterlambatan dan overbudget, dan juga memberikan kontribusi teoritis sebagai referensi untuk penelitian masa depan.
=================================================================================================================================
Construction projects often face challenges of delays and overbudgeting, leading to increased operational costs, financial losses, reputation decline, and loss of client trust. This study focuses on the variables influencing delays and overbudgeting at PT. WER using qualitative methods with multiple linear regression analysis and Relative Important Index (RII). The research findings indicate that the most influential variables on delays and overbudgeting at PT. WER involve the Unavailability of Working Capital, Delayed Payments to Contractors (Vendors), Changes in Initial Design, Discrepancies between Basic Design and Site Conditions, Delayed Payments from Project Owners, and Increases in Material Costs. Proposed solutions include efficient financial management, improved planning and control, proactive risk management, enhanced stakeholder communication, contract and payment clause evaluations, and material market monitoring. This study provides practical benefits in identifying and addressing delays and overbudgeting issues, while also contributing theoretically as a reference for future research.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Keterlambatan, Overbudget, Biaya, Regresi linier Berganda, RII (Relative Importance Index), Delay, Cost, Multiple linear regression
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Imam Faizal Rosyidn
Date Deposited: 01 Apr 2024 01:50
Last Modified: 01 Apr 2024 01:50
URI: http://repository.its.ac.id/id/eprint/107852