Analisa Perbandingan Waktu dan Biaya antara Metode Pelat Konvensional dan Pelat Half slab pada Pembangunan Monumen dan Museum Reog Ponorogo

Martiningsih, R. Sri (2024) Analisa Perbandingan Waktu dan Biaya antara Metode Pelat Konvensional dan Pelat Half slab pada Pembangunan Monumen dan Museum Reog Ponorogo. Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 2035201091-Undergraduate_Thesis.pdf] Text
2035201091-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (33MB) | Request a copy

Abstract

Proyek akhir ini berjudul ”Analisa Perbandingan Waktu dan Biaya antara Metode Pelat Konvensional dan Pelat Half slab pada Pembangunan Monumen dan Museum Reog Ponorogo” dengan data bangunan Proyek Monumen dan Museum Reog Ponorogo yang berlokasi di Desa Sampung, Kecamatan Sampung, Kabupaten Ponorogo, Jawa Timur. Proyek ini memiliki total 26 lantai dengan tinggi total 126 meter. Kontraktor Pelaksana berasal dari PT. Widya Satria – PT Samudra Anugrah Indah Permai KSO dan Konsultan MK berasal dari PT. Rancang Persada – PT. Delta Buana Konsultan KSO. Sedangkan untuk sub-kontraktor patung berasal dari Amboro Liring Sculpture dan perancah patung berasal dari PT. Beton Perkasa Wijaksana.
Pada penelitian ini akan dilakukan perbandingan metode pelat konvensional dan metode half slab pada pada Proyek Monumen dan Museum Reog Ponorogo dari segi waktu dan biaya. Metode pelaksanaan dan perhitungann waktu dan biaya ditinjau pada pekerjaan struktur beton saja. Lantai yang ditinjau adalah lantai 1 sampai dengan lantai 14 dengan item pekerjaan meliputi pekerjaan kolom, pekerjaan balok, pekerjaan pelat dan pekerjaan shear wall. Dalam proyek tersebut metode yang dilakukan adalah metode konvensional. Metode konvensional yang dilakukan menggunakan pengecoran ditempat yang dan menggunakan bekisting konvensional pada pelat dan membutuhkan banyak sumber daya seperti pekerja dan perancah serta bekisting. Sedangkan pada tugas akhir ini metode yang digunakan adalah pelat half slab. Metode half slab yang diusulkan diharapkan dapat digunakan untuk menghemat penggunaan sumber daya seperti pekerja dan bekisting. Perhitungann analisis biaya pelaksanaan pelat konvensional dilakukan berdasarkan pelaksanaan di lapangan dan untuk perhitungan harga bahan, alat, upah tenaga kerja menggunakan HSPK Kabupaten Ponorogo, sedangkan untuk perhitungann harga half slab dilakukan berdasarkan harga survei vendor half slab. Perhitungann analisis waktu dilakukan berdasarkan volume pekerjaan dan produktivitas serta penyusunan jadwal pekerjaan.
Setelah dilakukan analisa perhitungan didapatkan waktu total untuk metode konvensional adalah 299 hari dengan kebutuhan biaya sebesar Rp 26.674.282.003. Sedangkan waktu total untuk metode halfslab membutuhkan waktu 165 hari dengan kebutuhan biaya sebesar Rp25.578.256.730. Selisih waktu total antara kedua metode adalah 134 hari dan selisih biaya total sebesar Rp1.096.025.273,0.
Kata kunci: Half slab, metode pelaksanaan, pelat konvensional, perbandingan waktu dan biaya
=====================================================================================================================
This final project is entitled "Time dan Cost Comparison Conventional Plate Method and Half slab Plate in the Construction of Reog Ponorogo Monument and Museum" with building data of Reog Ponorogo Monument and Museum Project located in Sampung Village, Sampung District, Ponorogo Regency, East Java. The project has a total of 26 floors with a total height of 126 meters. The Managing Contractor comes from PT. Widya Satria – PT Samudra Anugrah Indah Permai KSO and MK Consultant from PT. Design Persada – PT. Delta Buana KSO Consultant. The sub-contractor of the statue comes from Amboro Liring Sculpture and the sculpture scaffolding comes from PT. Beton Perkasa Wijaksana.
In this study, a comparison of the conventional pelate method and half slab method will be carried out at the Reog Ponorogo Monument and Museum Project in terms of time and cost. The method of implementation and calculation of time and cost are reviewed on concrete structure work only. The floors reviewed are floors 1 to 14 with work items including column work, beam work, slab work and shear wall work. In the project, the method carried out is a conventional method. The conventional method is done using on-site casting and using conventional formwork on the plate and requires a lot of resources such as workers and scaffolding and formwork. While in this final project, the method used is a half slab plate. The proposed half-slab method is expected to be used to save the use of resources such as workers and formwork. The calculation of the cost analysis of conventional plate implementation is carried out based on the implementation in the field and for the calculation of the price of materials7, tools, labor wages using HSPK Ponorogo Regency, while the calculation of half slab prices is carried out based on half slab vendor survey prices. The calculation of time analysis is carried out based on the volume of work and productivity as well as the preparation of work schedules.
After the calculation analysis was carried out, the total time for the conventional method was 299 days with a cost requirement of Rp 26,674,282,003. Meanwhile, the total time for the conventional method is 165 days with a cost requirement of IDR 25,578,256,730. The total time difference between the two methods is 134 days and the total cost difference is IDR 1,096,025,273.07
Keywords: Implementation method, conventional plate, half slab, time and cost comparison

Item Type: Thesis (Other)
Uncontrolled Keywords: Half slab, metode pelaksanaan, pelat konvensional, perbandingan waktu dan biaya'Implementation method, conventional plate, half slab, time and cost comparison
Subjects: T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: R. Sri Martiningsih
Date Deposited: 06 Aug 2024 01:14
Last Modified: 06 Aug 2024 01:14
URI: http://repository.its.ac.id/id/eprint/112375

Actions (login required)

View Item View Item