Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Gedung Apartement North Tower ADR PIK dengan Metode Half Slab

Bhaskara, Narendra Andika and Purnamasari, Ragil and Zuhdy, Akhmad Yusuf (2024) Perhitungan Waktu dan Biaya Pelaksanaan Pembangunan Gedung Apartement North Tower ADR PIK dengan Metode Half Slab. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201072-Undergraduate_Thesis.pdf] Text
2035201072-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (21MB) | Request a copy

Abstract

Beton pracetak adalah teknologi konstruksi struktur beton dengan komponen – komponen penyusun yang dicetak terlebih dahulu pada suatu tempat khusus, terkadang komponen – komponen tersebut disusun dan disatukan terlebih dahulu, dan selanjutnya dipasang di lokasi, dengan demikian sistem pracetak ini akan berbeda dengan konstruksi monolit terutama pada aspek perencanaan yang tergantung atau ditentukan pula oleh metode pelaksanaan dari pabrikasi, penyatuan dan pemasangan, serta ditentukan pula oleh teknis perilaku sistem pracetak dalam hal cara penyambungan antar komponen join. Precast Half slab merupakan pelat pracetak yang memerlukan pengecoran ulang diatasnya (overtopping). Dengan kata lain, half slab merupakan pelat lantai yang memiliki beton pracetak sebagai alasnya dan beton konvensional sebagai topping/penutupnya. Secara umum, metode half slab mempunyai keuntungan karena cepat dan membutuhkan lebih sedikit pekerjaan.
Penyusunan proyek akhir ini merencanakan Manajemen Konstruksi pada proyek Pembangunan Apartement North Tower ADR PIK Jakarta. Proyek ini memiliki luas lahan ±20.122 M2 yang terdiri dari 3 lantai basement, 30 lantai tipikal, dan 1 lantai atap. Pada proyek akhir ini menggantikan metode cor konvensional pada pelat lantai menjadi beton precast Half Slab. Kelebihan precast half slab diantaranya adalah metode kerja yang efektif, efisiensi waktu dan biaya, dan dapat menekan biaya supervise karena dengan metode ini dapat mengurangi / memotong durasi proyek menjadi lebih singkat.
Penyusunan proyek akhir ini dimulai dari mengidentifikasi item pekerjaan kemudain menghitung volume dan produktivitas. Perhitungan tersebut akan menentukan durasi item pekerjaan yang selanjutnya digunakan untuk menyusun penjadwalan. Penjadwalan dibantu dengan aplikasi Microsoft Project. Hasil Analisa perhitungan waktu diperoleh 301 hari dan biaya pelaksanaan sebesar Rp. 56.649.566.908
==============================================================================================
Precast concrete is a concrete structure construction technology with components that are printed first in a special place, sometimes these components are arranged and put together first, and then installed on site, thus this precast system will be different from monolith construction, especially in planning aspects which depend or are also determined by the implementation method of fabrication, joining and installation, and are also determined by the technical behavior of the precast system in terms of connection methods between joint components. Precast Half slab is a precast plate that requires re-casting on top (overtopping). In other words, half slab is a floor slab that has precast concrete as the base and conventional concrete as the topping/covering. In general, the half slab method has the advantage of being fast and requiring less work.
The preparation of this final project plans Construction Management for the North Tower ADR PIK Jakarta Apartment Development project. This project has a land area of ±20,122 M2 consisting of 3 basement floors, 30 typical floors and 1 roof floor. In this final project, the conventional cast method for floor slabs is replaced with Half Slab precast concrete. The advantages of precast half slab include an effective work method, time and cost efficiency, and can reduce supervision costs because this method can reduce/cut the project duration to a shorter length.
Preparing this final project starts from identifying work items then calculating volume and productivity. This calculation will determine the duration of the work item which is then used to prepare scheduling. Scheduling is assisted with the Microsoft Project application. The results of the time calculation analysis obtained were 301 days and the implementation cost was Rp. 56,649,566,908

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Precast Concrete, Half Slab, Cost Comparison, Conventional Concrete, Beton Precast, Perbandingan Biaya, Beton Konvensional
Subjects: T Technology > TH Building construction > TH1461 Concrete construction.
T Technology > TH Building construction > TH437 Building--Cost control.
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Narendra Andika Bhaskara
Date Deposited: 12 Aug 2024 07:51
Last Modified: 12 Aug 2024 07:51
URI: http://repository.its.ac.id/id/eprint/112382