Saputro, Agustantio Priyangga Eko (2024) Analisis Perbandingan Waktu dan Biaya Bekisting Metode Konvensional dengan Table Form pada Proyek Pembangunan Gedung Kanker Rumah Sakit UPT Vertikal Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
2035201057_Undergraduate_Thesis.pdf Restricted to Repository staff only until 1 October 2026. Download (29MB) | Request a copy |
Abstract
Peningkatan ekspektasi konsumen terhadap ketersediaan properti sesuai dengan tenggat waktu proyek properti merupakan faktor penentu dalam membangun kredibilitas sebuah perusahaan jasa konstruksi, terutama pada proyek gedung bertingkat. Dalam pelaksanaan konstruksi gedung bertingkat, pekerjaan bekisting beton menghadapi tantangan biaya yang signifikan, sehingga diperlukan sebuah penetapan metode yang ekonomis baik dari segi biaya maupun waktu pelaksanaan. Oleh karena itu, perusahaan jasa konstruksi harus mengadopsi terobosan teknologi dalam metode pelaksanaan konstruksi mereka. Dalam konteks pelaksanaan bekisting pada proyek pembangunan Gedung Kanker Rumah Sakit UPT Vertikal Surabaya masih menggunakan bekisting metode konvensional yang berbasis kayu (plywood) atau multlipkes. Namun, dengan berkembangnya berbagai metode bekisting yang berpengaruh pada aspek biaya dan waktu pelaksanaan, terdapat metode baru yang perlu dipertimbangkan, salah satunya adalah metode table formwork. Banyak aspek positif yang bisa dilihat dari penerapan bekisting tabel formwork pada pekerjaan konstruksi. Oleh karena itu, pada tugas akhir ini akan membahas mengenai hasil analisis perbandingan waktu dan biaya antara bekisting metode konvensional dan table form. Metode yang digunakan dalam penyusunan tugas akhir ini menggunakan dua metode hasil pengumpulan data. Data primer didapatkan dari hasil obervasi untuk maerial bekisting, dan jam kerja tower crane sebagai jam kerja alat. Sedangkan, data sekunder didapatkan dari data proyek (RKS, Shop Drawing) dan studi pustaka. Sumber referensi utama yang digunakan dalam penyunsunan tugas akhir ini adalah dari Ir. A. Soedrajat S. Analisa Biaya Cara Modern dan Harga Satuan Pokok Kegiatan Kota Surabaya Tahun 2023. Proyek Rumah Sakit UPT Vertikal Surabaya yang menjadi objek penelitian menggunakan jenis metode bekisting konvensional yang kemudian dibandingkan dengan metode table form dengan meninjau pekerjaan struktur atas (pelat, balok, dan kolom). Lantai yang ditinjau dalam penelitian ini adalah struktur kolom lantai basement sampai pelat lantai 11. Setelah dilakukan analisa perhitungan waktu dan biaya didapatkan hasil bahwa pada pekerjaan bekisting metode konvensional memerlukan waktu pelaksanaan selama 123 hari kalender dengan total kebutuhan biaya sebesar Rp. 69,897,487,075.51. Sedangkan, bekisting metode table form memerlukan waktu pelaksanaan selama 98 hari kalender dengan total kebutuhan biaya sebesar Rp. 71,589,057,801.10.
========================================================================================================================
Increasing consumer expectations of property availability in accordance with property project deadlines is a determining factor in building the credibility of a construction service company, especially in multi-storey building projects. In the implementation of high-rise building construction, concrete formwork faces significant cost challenges, so it is necessary to determine a method that is economical both in terms of cost and implementation time. Therefore, construction service companies must adopt technological breakthroughs in their construction implementation methods. In the context of formwork implementation in the Surabaya Vertical UPT Hospital Cancer Building construction project, it still uses conventional formwork methods based on wood (plywood) or multlipkes. However, with the development of various formwork methods that affect the cost and time aspects of implementation, there are new methods to consider, one of which is the table formwork method. Many positive aspects can be seen from the application of table formwork in construction work. Therefore, this final project will discuss the results of the time and cost comparison analysis between conventional and table formwork formwork methods. The method used in the preparation of this final project uses two methods of data collection results. Primary data is obtained from the results of observations for formwork maerials, and tower crane working hours as tool working hours. Meanwhile, secondary data is obtained from project data (RKS, Shop Drawing) and literature study. The main reference sources used in the preparation of this final project are from Ir. A. Soedrajat S. Cost Analysis of Modern Methods and Basic Unit Prices of Surabaya City Activities in 2023. The UPT Vertical Surabaya Hospital project which is the object of research uses a type of conventional formwork method which is then compared with the table form method by reviewing the work of the upper structure (plates, beams, and columns). The floors reviewed in this study are column structure of basement floor to 11th floor slab. After analyzing the calculation of time and cost, the results show that the conventional formwork method requires an implementation time of 123 calendar days with a total cost requirement of Rp. 69,897,487,075.51. Meanwhile, the table form formwork method requires an implementation time of 98 calendar days with a total cost requirement of Rp. 71,589,057,801.10.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Biaya, Waktu, Table Formwork, Bekisting Konvensional, Cost, Time, Table Formwork, Conventional Formwork |
Subjects: | T Technology > TH Building construction > TH437 Building--Cost control. T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Agustantio Priyangga Eko Saputro |
Date Deposited: | 06 Aug 2024 01:12 |
Last Modified: | 06 Aug 2024 01:12 |
URI: | http://repository.its.ac.id/id/eprint/112729 |
Actions (login required)
View Item |