Rahayu, Novianti Dwi (2024) Analisis Perbandingan Waktu Dan Biaya Bekisting Metode Konvensional Dengan Sistem Table Formwork Pada Pembangunan Gedung At-Taawun Universitas Muhammadiyah Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Text
2035201085_Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2026. Download (14MB) | Request a copy |
Abstract
Metode kerja dan inovasi sangat penting dalam proses konstruksi proyek karena terkait dengan triple constraints: waktu, biaya, dan mutu. Metode kerja terdiri dari standar, pengujian, dan pengetahuan engineer untuk mencapai tujuan yang telah ditetapkan. Oleh karena itu, pemilihan metode kerja berdampak besar pada kemajuan dan efisiensi proyek. Table formwork menjadi salah satu opsi alternatif yang dapat diimplementasikan pada proyek dengan pertimbangan durasi serta biaya yang lebih efisien. Perhitungan waktu dan biaya dihitung berdasarkan metode pelaksanaan sesuai teori dan ilmu dari berbagai referensi serta dikaitkan dengan analisis dan survei lapangan baik secara langsung maupun histori. Metode yang digunakan untuk memperoleh data primer pada penelitian ini melalui observasi lapangan, wawancara, dan dokumentasi. Data sekunder diperoleh melalui data proyek (RKS, shop drawing, brosur toko, dll.) dan studi pustaka. Perhitungan waktu dan biaya pelaksanaan bekisting konvensional dan Table Formwork menggunakan hasil dari observasi dan referensi. Gedung At-Taawun Universitas Muhammadiyah Surabaya tergolong ke dalam high rise building dengan struktur 1 lantai basemen, 19 lantai tower. Bekisting atau formwork yang digunakan sebagai acuan pada proyek ini adalah metode konvensional dengan scaffolding sebagai sistem perancahnya. Pada proyek akhir ini, lantai yang ditinjau adalah lantai 2 – 12. Berdasarkan hasil perencanaan, metode pelaksanaan untuk metode konvensional membutuhkan durasi yang lebih lama dari metode table formwork. Hasil dari pengolahan data didapatkan durasi pekerjaan dengan metode konvensional dapat diselesaikan dengan durasi 155 hari, sedangkan dengan metode table formwork pekerjaan dapat diselesaikan dengan durasi 130 hari. Ditinjau dari perhitungan rencana anggaran pelaksanaan (RAP) untuk metode konvensional adalah sebesar Rp21.598.777.449,93 sedangkan pada metode table formwork didapatkan total biaya sebesar Rp22.610.784.905,70.
=================================================================================================================================
Work methods and innovations are critical in the project construction process as they relate to the triple constraints: time, cost, and quality. Work methods consist of standards, tests, and engineer knowledge to achieve set goals. Therefore, the selection of work methods has a great impact on project progress and efficiency. Table formwork is one of the alternative options that can be implemented on the project in consideration of efficient duration and cost. The calculation of time and cost is calculated based on the implementation method according to the theory and knowledge from various references and is associated with analysis and field surveys both directly and historically. The method used to obtain primary data in this research is through field observations, interviews, and documentation. Secondary data was obtained through project data (RKS, shop drawings, brochure etc.) and literature study. Calculation of the time and cost of implementing conventional formwork and Table Formwork uses the results of observations and references. At-Taawun Building of Universitas Muhammadiyah Surabaya is classified as a high rise building with a structure of 1 basement floor, 19 tower floors. The formwork used in this project is the conventional method with the scaffolding system. In this final project, the floors reviewed are floors 2-12. Based on the planning results, the implementation method for the conventional method requires a longer duration than the table formwork method. The results of data processing the duration of work with conventional methods can be completed with 155 days, while with the table formwork method the work can be completed with 130 days. In terms of the calculation of the implementation budget plan for the conventional method is IDR21,598,777,449.93 while the table formwork method obtained a total cost of IDR22,610,784,905.70.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Konvensional, table formwork, waktu, biaya, metode, produktivitas, Conventional, time, cost, method, productivity. |
Subjects: | T Technology > T Technology (General) > T56.8 Project Management T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | NOVIANTI DWI RAHAYU |
Date Deposited: | 22 Aug 2024 04:29 |
Last Modified: | 22 Aug 2024 04:29 |
URI: | http://repository.its.ac.id/id/eprint/112830 |
Actions (login required)
View Item |