Perhitungan Biaya dan Waktu Pelaksanaan Proyek Pembangunan Gedung Kantor DPRD Jawa Tengah

Gutama, Resta Sewa (2022) Perhitungan Biaya dan Waktu Pelaksanaan Proyek Pembangunan Gedung Kantor DPRD Jawa Tengah. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035201047-Ungraduate_Thesis.pdf] Text
2035201047-Ungraduate_Thesis.pdf

Download (44MB)

Abstract

Bangunan yang dijadikan lokasi studi dalam penulisan proyek akhir berjudul “Perhitungan Biaya dan Waktu Pelaksanaan Proyek Pembangunan Gedung Kantor DPRD Jawa Tengah” adalah Gedung Kantor DPRD Jawa Tengah yang berada di Jalan Pahlawan No. 7, kelurahan Mugassari, Kecamatan Semarang Kota Semarang, Jawa Tengah. Gedung ini dibangun oleh P.T Adhi Persada Gedung. Gedung setinggi 11 lantai ini memiliki total luas ± 1112 m² dengan beton bertulang sebagai material utama. Dalam proyek akhir ini, lantai yang ditinjau adalah lantai dasar sampai lantai 11. Untuk struktur yang ditinjau dalam proyek akhir ini adalah struktur bawah dan atas. Struktur bawah terdiri dari pondasi bore pile, pile cap, dan tie beam. Sedangkan untuk struktur atas antara lain kolom, balok, pelat dan tangga. Seluruh pekerjaan beton dilakukan menggunakan metode cast in-situ. Dalam perhitungan waktu, dihitung berdasarkan volume pekerjaan, produktivitas, durasi pekerjaan dan kebutuhan sumber daya tiap item pekerjaan. Sedangkan untuk perhitungan biaya meliputi harga material, upah pekerja dan harga alat yang dibutuhkan. Harga yang digunakan adalah harga survey lapangan di Kota Semarang. Untuk penjadwalan item pekerjaan dilakukan menggunakan software Microsoft Project. Hasil akhir dari proyek akhir ini adalah rekapitulasi perhitungan biaya dan waktu pelaksanaan dan kurva S Gedung Kantor DPRD Jawa Tengah. Berdasarkan hasil analisan, didapatkan durasi 296 hari kerja dengan biaya pelaksanaan sebesar Rp.
==============================================================================================================================
The building which is used as the location’s study of the final project entitled "Cost and Time Calculation of The Construction of DPRD Office Building Central Java is the Central Java DPRD Office Building located at Jalan Pahlawan No. 7, Mugassari, Semarang, Central Java. This building was built by P.T. Adhi Persada Gedung. This 11 story building have a total area of ± 1112 m² with reinforced concrete as the main material. In this final project, the floor being
reviewed is the ground floor to the 11th floor. The structures that are reviewed in this final project are the lower and upper structures. The lower structure consists of bore pile foundation, pile cap, and tie beam. Meanwhile, the upper structures include columns, beams, plates and stairs. All concrete works were carried out using the cast in�situ method. In the calculation of time, it is calculated based on the volume of work, productivity, duration of work and resource requirements of each work item. Meanwhile, the cost calculation includes the price of materials, wages of workers and the price of the equipment needed. Current price is the price of the field survey in the city of Semarang. Schedulling of work items is done using Microsoft Project software. The final result of this final project is a recapitulation of cost dan time calculation and S curve of DPRD Office Building Central Java Based on the results of the analysis, the duration pf work for 296 working days was abtained with an implementation cost of Rp.

Item Type: Thesis (Other)
Additional Information: RSIS 692.5 Gut p-1 2022
Uncontrolled Keywords: Biaya dan waktu pelaksanaan dan kurva S, Cost and Time of implementation dan S curve
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Mr. Marsudiyana -
Date Deposited: 20 Nov 2024 02:17
Last Modified: 20 Nov 2024 02:19
URI: http://repository.its.ac.id/id/eprint/115801

Actions (login required)

View Item View Item