Perencanaan Tps Limbah B3 Di Pt Inka (Persero) Kota Madiun

Puspitasari, Ayu Indah (2022) Perencanaan Tps Limbah B3 Di Pt Inka (Persero) Kota Madiun. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03211840000086-Undergraduate_Thesis.pdf] Text
03211840000086-Undergraduate_Thesis.pdf

Download (8MB)

Abstract

PT INKA (Persero) merupakan salah satu industri yang bergerak di bidang manufaktur transportasi kereta api di Indonesia. Limbah yang dihasilkan pada proses produksi pembuatan dan perbaikan kereta api dapat berupa B3 dan non B3. Pengemasan limbah cair seperti oli bekas dan pendingin bekas ada beberapa yang belum sesuai penataan karakteristik limbah B3. Masih terdapat kemasan limbah B3 yang belum memiliki simbol dan label. Hal ini menyebabkan penataan lokasi penyimpanan limbah beberapa belum tepat dan belum adanya identitas pada kemasan limbah B3 dikarenakan belum diberikan dan isinya belum penuh. Perlu direncanakan TPS limbah B3 yang berfungsi untuk menampung limbah B3 sesuai dengan karakteristik limbah B3 serta memiliki simbol dan label pada kemasannya. Oleh karena itu, tujuan dari penelitian ini adalah untuk merencanakan TPS untuk limbah B3 di PT INKA (Persero) dan menentukan biaya yang diperlukan untuk pembangunan TPS limbah B3 di PT INKA (Persero). Perencanaan dimulai dari melakukan observasi lapangan di PT INKA (Persero), khususnya di TPS limbah B3 untuk mendapatkan data primer. Data primer meliputi jenis, jumlah, pengelolaan limbah B3, kondisi eksisting, dan fasilitas TPS limbah B3. Tahap selanjutnya adalah menganalisis data yang diperoleh dengan mencocokkannya dengan literatur dan menghitung neraca massa limbah B3. Kemudian merancang kemasan dan bangunan TPS
limbah B3, serta menghitung biaya yang dibutuhkan untuk merenovasi TPS limbah B3. Pembiayaan dalam perencanaan menggunakan acuan HSPK Kota Madiun tahun 2020 dan HSPK Kota Surabaya 2018. Hasil penelitian menunjukkan bahwa pengelolaan limbah B3 dan TPS limbah B3 PT INKA (Persero) masih terdapat beberapa persyaratan yang belum memenuhi Peraturan Pemerintah nomor 22 Tahun 2021. Perencanaan pengemasan disesuaikan dengan karakteristik timbulan limbah dengan pemberian simbol dan label yang sesuai. Selain itu, penataan limbah B3 di TPS limbah B3 perlu diperhatikan dengan jarak antar limbah 60 cm dengan membuat dinding pemisah jika karakteristiknya berbeda. Analisis biaya yang dibutuhkan untuk merenovasi TPS limbah B3 PT INKA (Persero) dengan biaya pekerjaan sebesar Rp. 140.000.000 termasuk tambahan PPN 11%. Biaya pengadaan peralatan TPS limbah B3 sebesar Rp. 174.210.000.
===============================================================================================================================
PT INKA (Persero) is an industry in manufacturing rail transportation in Indonesia. Waste generated in the production process of making and repairing trains can be in the form of B3 and non-B3. The packaging of liquid waste, such as used lubricating oil and used cooling, are not in accordance with the arrangement of the characteristics of B3 waste. There are still packages of waste B3 that do not have symbols and labels. This causes the arrangement of waste storage locations and the absence of identity in the B3 waste packaging because it has not been given and its contents are not full. It is necessary to plan a temporary storage area (TPS) for B3 waste to function to store B3 waste in accordance with the characteristics of B3 waste and have symbols and labels on the packaging. Therefore, the purpose of this study is to plan a TPS for B3 waste and determine the costs required for the construction of a TPS for B3 waste at PT INKA (Persero). Planning starts from conducting field observations at PT INKA (Persero), especially at TPS for B3 waste, to obtain primary data. Primary data includes type, amount, management of B3 waste, existing conditions, and B3 waste TPS facilities. The next stage is analyzing the data obtained by matching it with the literature and calculating the B3 waste mass balance. Then design the packaging and building of the B3 waste TPS, as well as calculate the costs needed to renovate the B3 waste TPS. Financing in planning uses the Madiun City HSPK and Surabaya City HSPK references in 2020 and 2018, respectively. The result shows that the B3 waste operations and PT INKA (Persero) B3 waste TPS still had several requirements that did not meet Government Regulation number 22 of 2021. Packaging planning is adjusted to the waste-generated characteristics by giving appropriate symbols and labels. In addition, the arrangement of B3 waste at the B3 waste TPS needs to be considered with a distance of 60 cm between wastes by making a dividing wall if the characteristics differ. Analysis of the costs needed to renovate PT INKA (Persero) B3 waste TPS with a work cost of Rp. 140.000.000 including the addition of 11% VAT. The cost of procuring B3 waste TPS equipment is Rp. 174.210,000.

Item Type: Thesis (Other)
Additional Information: RSL 628 445 Pus p-1 2022
Uncontrolled Keywords: Kemasan Limbah B3, Neraca Massa Limbah B3, PT INKA (Persero), TPS Limbah B3, B3 Waste Packaging, B3 Waste Mass Balance, PT INKA (Persero), B3 Waste TPS
Subjects: T Technology > T Technology (General) > T55.3.H3 Hazardous substances--Safety measures.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Environmental Engineering > 25201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 04 Dec 2024 07:38
Last Modified: 04 Dec 2024 07:38
URI: http://repository.its.ac.id/id/eprint/115902

Actions (login required)

View Item View Item