Putro, M. Adam Emirrosnando Syah (2025) Analisis Risiko Kecelakaan Kerja Menggunakan Metode Bowtie Pada Proyek Tower 3 ITS Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.
![]() |
Text
03111840000143-Undergraduate-Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2027. Download (10MB) | Request a copy |
Abstract
Kecelakaan kerja adalah suatu kejadian yang tidak direncanakan yang terjadi dalam setiap bidang pekerjaan. Terjadinya kecelakaan kerja dapat mengganggu, menghambat bahkan membatalkan sebuah kegiatan pekerjaan. Terjadinya kecelakaan kerja dapat menyebabkan dampak mulai dari cedera ringan hingga kematian, maupun kerusakan proyek yang dapat menghambat atau menggagalkan proyek tersebut. Proyek Pengerjaan Tower 3 ITS Surabaya merupakan proyek pembangunan gedung yang memungkinkan berbagai risiko kecelakaan kerja pada proses pembangunannya dikarenakan sifat proyek ini yaitu proyek gedung bertingkat tinggi. Penulisan penelitian ini bertujuan untuk mengetahui risiko tersebut dan melakukan kontrol terhadap risiko yang telah teridentifikasi. Penelitian ini menggunakan standar sesuai yang tertulis pada Risk Management AZ/NZ 4360:1999. Penelitian ini dimulai dengan melakukan identifikasi risiko yang relevan dengan keadaan lapangan, meliputi penyebaran kuesioner survei pendahuluan untuk mendapatkan variabel risiko yang relevan dengan keadaan lapangan. Kemudian dilakukan penyebaran survei kuisioner utama dengan data yang diharapkan dari kuesioner tersebut berupa beberapa variabel seperti besaran likelihood dan severity, lalu dilakukan pengolahan data yang menghasilkan matriks risiko. Dari matriks tersebut dapat diketahui risiko dominan yang akan dicari penyebab, dampak, serta kontrolnya menggunakan metode bowtie (Bowtie Analysis Method). Dari metode bowtie, dapat dianalisis terhadap masing-masing penyebab, kontrol untuk masing-masing dampak, faktor eskalasi, dan kontrol faktor eskalasi. Dari hasil penelitian ditemukan 97 total risiko yang relevan dengan pengerjaan proyek dan dari situ didapat 5 jenis risiko yang dinyatakan dominan dalam pengerjaan proyek.
==================================================================================================================================
Workplace accidents are an unprecedented event that occur in a workplace. It could disrupt, halt or even cancel an ongoing project. The effects of workplace accidents include, but not limited to light bruises to death in severe cases, and collateral damages that could halt and/or cancel said project. The ITS Third Tower project situated in eastern Surabaya classifies as a high-risk project, due to its nature in being a high elevation building that could cause multiple risks and hazards. The writing of research is to identify and control the risk that comes with this project, and it relies on “Risk Management AS/NZS 4360:2004” as its guidelines. The identification process starts with identifying the risks that are associated with the fieldwork, and the project condition itself. Using introductory questionnaire as means to identify the relevant and important risks to watch out for, then a primary questionnaire to identify the likelihood and severity index, from there all the gathered data are processed to create a risk matrix. From this matrix we could pick the dominant risk in the work field which then analyzed to determine its cause, impact, and control using the Bowtie Analysis Method. From this method we can also determine each cause, controls for each cause, escalation factors, and controls for each escalation factors. Based on the results of this study, there are 97 identified risks that are related to this project, and 5 of them being identified as a dominant risk.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Analisis Risiko Kecelakaan Kerja, Bowtie Analysis Methood, Kecelakaan Kerja, Likelihood Index, Severity Index, Occupation Hazard Analysis, Workplace Incident. |
Subjects: | T Technology > TH Building construction > TH438 Construction industry--Management. Project management. |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Muhammad Adam Emirrosnando Syah Putro |
Date Deposited: | 31 Jan 2025 04:42 |
Last Modified: | 31 Jan 2025 04:43 |
URI: | http://repository.its.ac.id/id/eprint/117278 |
Actions (login required)
![]() |
View Item |