Arrosyid, Muhammad Rifqi Arwin (2025) Penerapan Building Information Modeling ( BIM ) Untuk Analisis Estimasi Biaya Proyek Dan Penjadwalan Pekerjaan Bekisting Menggunakan Aluminium Formwork Pada Proyek Pembangunan Gedung Abdoel Gaffar Pringgodigdo Universitas Airlangga. Other thesis, Institut Teknologi Sepuluh Nopember.
![]() |
Text
2035201118-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2027. Download (19MB) | Request a copy |
Abstract
Pembangunan infrastruktur menjadi fokus utama dalam Rencana Pembangunan Jangka Panjang Nasional (RPJPN) Indonesia 2005-2025, dengan penekanan pada sektor konstruksi dalam Rencana Pembangunan Jangka Menengah Nasional (RPJMN) 2020-2024. Untuk mendorong terlaksananya rencana tersebut, maka muncul beberapa inovasi baru pada pekerjaan konstruksi terutama pada sektor teknologi informasi dan manajemen sumber daya, khususnya dalam pekerjaan bekisting yang memicu pengembangan metode baru seperti penggunaan Building Information Modeling (BIM) dan bekisting aluminium. Pada proyek akhir ini, penulis akan memberikan upaya penerapan bekisting aluminium dengan membandingkan estimasi waktu dan biaya pelaksanaan antara penggunaan bekisting konvensional dan bekisting aluminium pada proyek Gedung Kuliah Abdoel Gaffar Pringgodigdo Universitas Airlangga serta menggunakan teknologi BIM sebagai kontrol volume pekerjaan dan visualisasi estimasi waktu pekerjaan. Proyek ini mencakup pekerjaan struktur mulai dari lantai parkir hingga rangka atap yang meliputi pekerjaan pilecap, tiebeam, kolom, balok, plat, tangga, dan rangka baja atap yang memiliki struktur tipikal pada setiap lantai dengan acuan teori-teori terkalit perhitungan waktu dan biaya. Dari hasil analisis proyek akhir ini, Pembangunan Gedung Kuliah Abdoel Gaffar Pringgodigdo Universitas Airlangga dengan menggunakan metode BIM dan bekisting konvensional dapat diselesaikan dalam waktu 329 hari kerja dengan biaya sebesar Rp 34.815.071.488,26. Sementara itu, penggunaan metode BIM dan bekisting aluminium dapat menyelesaikan proyek dalam waktu 295 hari kerja dengan biaya sebesar Rp 37.979.941.503,58. Dari perbandingan kedua metode tersebut dapat diketahui bahwa penggunaan bekisitng aluminium dapat mempercepat konstruksi sebesar 10%, namun membutuhkan biaya 8% lebih tinggi dibandingkan dengan metode bekisting konvensional.
===================================================================================================================================
Infrastructure development is the main focus in Indonesia's 2005-2025 National Long-Term Development Plan (RPJPN), with an emphasis on the construction sector in the 2020-2024 National Medium-Term Development Plan (RPJMN). To encourage the implementation of this plan, several new innovations have emerged in construction work, especially in the information technology and resource management sectors, especially in formwork work which has triggered the development of new methods such as the use of Building Information Modeling (BIM) and aluminum formwork. In this final project, the author will provide efforts to implement aluminum formwork by comparing the estimated implementation time and costs between the use of conventional formwork and aluminum formwork on the Abdoel Gaffar Pringgodigdo Lecture Building project, Airlangga University and using BIM technology to control work volume and visualize estimated work time. This project includes structural work from the parking floor to the roof frame which includes work on pile caps, tiebeams, columns, beams, plates, stairs and roof steel frames which have a typical structure on each floor with reference to theories regarding time and cost calculations. From the results of this final project analysis, the construction of the Abdoel Gaffar Pringgodigdo Lecture Building at Airlangga University using the BIM method and conventional formwork can be completed within 329 working days at a cost of Rp 34.815.071.488,26. Meanwhile, using the BIM method and aluminum formwork can complete the project within 295 working days at a cost of Rp 37.979.941.503,58. From a comparison of the two methods, it can be seen that using aluminum formwork can speed up construction by 10%, but costs 8% more than conventional formwork methods.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Manajemen Konstruksi, Bekisting Aluminium, Building Information Modeling (BIM), Estimasi Biaya, Penjadwalan Pekerjaan. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction T Technology > TH Building construction > TH437 Building--Cost control. T Technology > TH Building construction > TH438 Construction industry--Management. Project management. T Technology > TH Building construction > TH438.13 Building information modeling. |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Muhammad Rifqi Arwin Arrosyid |
Date Deposited: | 05 Feb 2025 01:45 |
Last Modified: | 05 Feb 2025 01:45 |
URI: | http://repository.its.ac.id/id/eprint/117896 |
Actions (login required)
![]() |
View Item |