Akmaluddin, Muchammad (2022) Rancang Bangun Dan Analisa Simulasi Sistem Gating Dan Feeding Pada Investment Casting Cable Protector Untuk Peningkatan Kapasitas Produksi (Studi Kasus: Perusahaan X). Other thesis, Institut Teknologi Sepuluh Nopember.
![]() |
Text
02111640000141-Undergraduate_Thesis.pdf Download (5MB) |
Abstract
Untuk memenuhi pesanan 12.650 unit cable protector yang diproduksi menggunakanan metode investment casting, PT. X harus memproduksi minimal 1.000 unit cable protector yang terdiri dari body dan clamp setiap minggunya hingga akhir bulan Februari 2022. Pada bulan Oktober 2021, PT. X hanya mampu memproduksi 798 unit Body dan Clamp setiap minggunya (319 unit clamp atau body per hari). hal ini disebabkan oleh rendahnya kapasitas produksi pada proses dipping yang hanya mampu menghasilkan 340 unit body atau 340 unit clamp per hari dan pada proses pouring yang hanya mampu menghasilkan 349 unit body atau 384 unit clamp perhari. Setelah dilakukan pengamatan, didapatkan akar permasalahan berada pada nilai casting yield yang rendah pada pohon casting, yaitu sebesar 30% pada Body dan 19% pada clamp. Sehingga diperlukan sebuah penelitian optimasi desain sistem gating dan feeding cable protector untuk meningkatkan kapasitas produksi proses pouring dan dipping. Metode yang digunakan pada penelitian ini adalah dengan memodelkan secara 3 Dimensi pohon cor cable protector yang digunakan pabrik dan pohon cor yang telah ditingkatkan parameter casting yield. Kemudian desain tersebut disimulasikan proses pengisian dan pemadatan molten cor dengan menggunakan software Click2Cast. Hasil penelitian ini mendapatkan bahwa pohon body 6 tangkai dan 8 tangkai menghasilkan cacat lebih sedikit daripada pohon 4 tangkai yang digunakan oleh pabrik. dan pada pohon clamp 6 tangkai dan 8 tangkai tidak mengalami peningkatan cacat yang signifikan. juga baik pohon body dan pohon clamp menghasilkan casting yield yang lebih besar. Yaitu yang berturut-turut bernilai 31,9% dan 33,0% untuk pohon clamp 6 dan 8 tangkai dan bernilai 46,8% dan 48,2% untuk pohon body 6 dan 8 tangkai. Dengan menggunakan perbandingan linier terhadap kapasitas produksi pohon 4 tangkai. Maka produksi proses pouring meningkat menjadi 786-812 unit clamp per hari atau 607-625 unit body per hari. Sedangkan proses dipping meningkat hingga mampu menghasilkan 480 unit body atau clamp per hari untuk pohon 6 tangkai dan 640 unit body atau clamp per hari untuk pohon 8 tangkai.
=================================================================================================================================
To fulfill the order for 12,650 units of cable protector produced using the investment casting method, PT. X must produce a minimum of 1,000 units of cable protector consisting of body and clamp every week until the end of February 2022. In October 2021, PT. X is only able to produce 798 units of Body and Clamp every week (319 unit of clamp or body per day). this is due to the low production capacity in the dipping process which is only able to produce 340 units of body or 340 units of clamp per day and in the pouring process which is only able to produce 349 units of body or 384 units of clamp per day. After observing, it was found that the root of the problem was in the low casting yield value on the casting tree, which was 30% on the Body and 19% on the clamp. Therefore, a research on the optimization design of the gating and feeding system cable protector is needed to increase the production capacity of the pouring and dipping process. The method used in this research is a 3-dimensional model of the cable protector cast tree used by the factory and the cast tree which has increased casting yield parameters. Then the design is simulated the process of filling and solidification molten casting using Click2Cast software. The results of this study found that the 6 stalks and 8 stalks body trees produced fewer defects than the 4 stalks trees used by the factory. and the 6 stalks and 8 stalks of the clamp trees does not have a significant increase in defects. also both the body trees and the clamp trees resulted an increase in casting yield that is worth 31.9% and 33.0% for the clamp 6 and 8 stalks trees. And worth 46.8% and 48.2% for the body 6 and 8 stalks trees, respectively. By using a linear comparison to the production capacity of 4 stalks tree. Then the production of the pouring process increases become 786-812 units of clamp per day or 607-625 units of body per day. Meanwhile, the dipping process increases to produce 480 units of body or clamp per day for 6 stalks tree and 640 units of body or clamp per day for 8 stalks tree.
Item Type: | Thesis (Other) |
---|---|
Additional Information: | RSM 671.255 Akm r-1 2022 |
Uncontrolled Keywords: | Investment Casting, Casting Simulation, Casting Yield, optimasi Gating dan Feeding Sistem, kapasitas produksi, Investment Casting, Casting Simulation, Casting Yield, Gating and Feeding System Optimization, production capacity. |
Subjects: | T Technology > TS Manufactures > TS233 Sand casting. Metal castings--Thermal properties. |
Divisions: | Faculty of Industrial Technology and Systems Engineering (INDSYS) > Mechanical Engineering > 21201-(S1) Undergraduate Thesis |
Depositing User: | Mr. Marsudiyana - |
Date Deposited: | 13 Feb 2025 04:17 |
Last Modified: | 13 Feb 2025 04:17 |
URI: | http://repository.its.ac.id/id/eprint/118713 |
Actions (login required)
![]() |
View Item |