Analisis Risiko Kecelakaan Kerja Dengan Metode Fault Tree Analysis Pada Proyek Pembangunan Gedung Bertingkat

Gusti, Riski Nugrahaning (2022) Analisis Risiko Kecelakaan Kerja Dengan Metode Fault Tree Analysis Pada Proyek Pembangunan Gedung Bertingkat. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6012211130-Master_thesis.pdf] Text
6012211130-Master_thesis.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

Risiko merupakan kemungkinan atau ketidakpastian terjadinya suatu peristiwa yang tidak diharapakan ketika sedang melakukan pekerjaan yang dapat merugikan pihak yang sedang melakukan kegiatan tersebut. Kecelakaan kerja dalam bidang konstruksi adalah hasil dari mitigasi risiko yang kurang tepat sasaran dalam menangani risiko kecelakaan kerja. Kecelakaan kerja dapat disebabkan oleh beberapa faktor utama yaitu faktor kondisi lingkungan, peralatan pekerjaan, dan pekerja itu sendiri. Salah satu usaha yang dapat dilakukan dalam meminimalisir suatu risiko kecelakaan kerja adalah dengan mengidentifikasi penyebab dari risiko itu yang kemudian dapat digunakan dalam perencanaan mitigasi risiko yang mungkin terjadi. Dalam tesis ini akan membahas mengenai analisis risiko kecelakaan kerja menggunakan metode Fault Tree Analysis pada konstruksi gedung. Tahapan-tahapan yang akan dilakukan pada penelitian ini meliputi. Studi literatur untuk menemukan risiko yang akan di analisis menggunakan FTA. Kemudian risiko yang didapat dari hasil studi literatur akan dicari penyebabnya dengan Fault Tree Analysis. Setelah dilakukan pembuatan diagram Fault Tree Analysis akan dilakukan perhitungan probabilitas terjadinya risiko dengan menggunakan probabilitas basic event dan persamaan yang di peroleh dari MOCUS. Setelah dilakukan perhitungan .probabilitas terjadinya risiko maka akan dilakukan perencanaan penanganan risiko berdasarkan probabilitas penyebab masing masing risiko. Langkah terakhir yang dilakukan dalam penelitian ini adalah menghitung ulang probabilitas terjadinya risiko dengan menggunakan probabilitas dari basic event dan persamaan yang diperoleh dari MOCUS. Hasil yang didapatkan dari penelitian penelitian ini adalah penyebab dari risiko pekerja tertabrak alat berat yang disebabkan 13 basic event dengan probabilitas 0,99993 atau dapat dikategorikan very critical dan setelah direncanakan penanganan terhadap masing masing basic event probabilitas dari risiko ini turun menjadi 0,20368 atau dapat dikategorikan negligible. Risiko pekerja terjatuh dari ketinggian menghasilkan 17 basic event dengan probabilitas 0,99996 atau dapat dikategorikan very critical dan setelah direncanakan penanganan terhadap masing masing basic event probabilitas dari risiko ini turun menjadi 0,32206 atau dapat dikategorikan negligible. Risiko pekerja tertusuk material tajam berserakan menghasilkan 11 basic event dengan probabilitas 0,99884 atau dapat dikategorikan very critical dan setelah direncanakan penanganan terhadap masing masing basic event probabilitas dari risiko ini turun 0,24492 atau dapat dikategorikan negligible.
===================================================================================================================================
Risk is the possibility or uncertainty of the occurrence of an event that is not expected when doing work that can harm the party who is carrying out the activity. Work accidents in the construction sector are the result of risk mitigation that is not on target in dealing with the risk of work accidents. Work accidents can be caused by several main factors, namely factors of environmental conditions, work equipment, and the workers themselves. One of the efforts that can be done in minimizing a risk of work accidents is to identify the cause of that risk which can then be used in risk mitigation planning that may occur. In this thesis, we will discuss the risk analysis of work accidents using the Fault Tree Analysis method in building construction. The stages that will be carried out in this study include. Literature study to find the risks to be analyzed using FTA. Then the risks obtained from the results of the literature study will be searched for the cause with Fault Tree Analysis. After making the Fault Tree Analysis diagram, a calculation of the probability of occurrence of risk will be carried out using the probability of the basic cause and the equation obtained from the MOCUS. After calculating the probability of occurrence of risk, a risk handling plan will be carried out based on the probability of the cause of each risk. The last step taken in this study is to recalculate the probability of occurrence of risks using the probabilities of the basic causes and equations obtained from MOCUS. The results obtained from this study are the cause of the risk of workers being hit by heavy equipment caused by 13 basic events with a probability of 0.99993 or can be categorized as very critical and after planned handling of each basic event the probability of this risk drops to 0.20368 or can be categorized as negligible. The risk of workers falling from a height results in 17 basic events with a probability of 0.99996 or can be categorized as very critical and after planned handling of each basic event the probability of this risk drops to 0.32206 or can be categorized as negligible. The risk of workers being punctured by sharply scattered materials resulted in 11 basic events with a probability of 0.99884 or can be categorized as very critical and after planned handling of each basic event the probability of this risk drops by 0.24492 or can be categorized as negligible.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Kecelakaan Kerja, Konstruksi Gedung, Fault Tree Analysis, Probabilitas Penyebab Kecelakaan Kerja, Work Accident, Building Construction, Fault Tree Analysis, Probability for the cause of work accident
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22101-(S2) Master Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 07 Jan 2026 04:20
Last Modified: 07 Jan 2026 04:20
URI: http://repository.its.ac.id/id/eprint/129331

Actions (login required)

View Item View Item