Desain Modifikisi Struktur Jembatan Tol Cisomang Menggunakan Busur Box Baja Dengan Lantai Kendaraan Di Tengah

Putra, Dimas Permana Satriya (2017) Desain Modifikisi Struktur Jembatan Tol Cisomang Menggunakan Busur Box Baja Dengan Lantai Kendaraan Di Tengah. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3115105019_Undergraduate-Thesis.pdf]
Preview
Text
3115105019_Undergraduate-Thesis.pdf - Published Version

Download (15MB) | Preview

Abstract

Dalam perancangan dan perencanaan struktur jembatan, kekuatan struktural merupakan isu utama yang harus diperhatikan. Kekuatan struktural bisa menjadi tolok ukur seberapa layak jembatan dalam aplikasinya. Dalam perancangan jembatan, meliputi desain struktur atas yang harus memenuhi standar pemuatan jembatan (SNI T-02-2016), kode struktur baja untuk jembatan (RSNI T-03-2005), dan beton Kode struktur jembatan (RSNI T-12-2004).
Pada tugas akhir ini, struktur jembatan dirancang menggunakan tipe busur tipe busur tengah melalui sistem lengkung. Nama jembatan untuk disain adalah jembatan tol Cisomang. Jembatan yang ada menggunakan sistem struktur I-girder dan akan dimodifikasi dalam tugas akhir ini. Kelebihan penggunaan metode ini antara lain, strukturnya bisa mengurangi kebutuhan sejumlah pilar. Arsitektur dan estetika jembatan juga merupakan nilai penting dalam modifikasi jembatan

============================================================================================

In the design and planning of the bridge structure, structural strength is the main issue to be considered. Structural strength can be a benchmark on how feasible the bridge in its application. In the design of the bridge, it covers the design of upper structure which has to comply the bridge’s loading standard (SNI T-02-2016), the steel structure code for the bridge (RSNI T-03-2005), and the concrete structure code for the bridge (RSNI T-12-2004).

In this final project, the bridge structure is designed using the arc box steel type half through arch system. The bridge name for the design case is the Cisomang toll bridge. The existing bridge uses I-girder structural system and it will be modified in this final project. The advantages of using this method, among others, is that the structure can reduce the needs of numerous pillars. The architectural and aesthetics of the bridge is also an important value in the modification of the bridge.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Jembatan lengkung(busur), gempa bumi, busur di tengah, bantalan pot bearing, struktur baja
Subjects: T Technology > TG Bridge engineering
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Putra Dimas Permana Satriya
Date Deposited: 13 Oct 2017 06:09
Last Modified: 06 Mar 2019 06:25
URI: http://repository.its.ac.id/id/eprint/46980

Actions (login required)

View Item View Item