Analisa Produktivitas Pekerja Dengan Metode Time Study Pada Proyek Pembangunan Gedung Teknik Industri ITS

Malamassam, Leonart (2016) Analisa Produktivitas Pekerja Dengan Metode Time Study Pada Proyek Pembangunan Gedung Teknik Industri ITS. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3109100089-Undergraduate-Theses.pdf - Published Version

Download (2MB) | Preview

Abstract

Produktivitas pekerja menentukan keberhasilan pelaksanaan jadwal proyek konstruksi, karena berdampak kepada kesesuaian antara perencanaan jadwal konstruksi dengan progres pekerjaan di lapangan. Oleh karena itu, pekerjaan struktur beton bertulang yang merupakan salah satu aktivitas kritis dalam perencanaan jadwal sebuah proyek perlu dianalisa produktivitas pekerjanya. Tugas akhir ini bertujuan untuk menganalisa produktivitas pekerja pada pekerjaan struktur beton bertulang dan mencari faktor apa saja yang dapat mempengaruhi produktivitas pekerja pada proyek pembangunan Gedung Teknik Industri ITS. Perhitungan produktivitas dilakukan dengan metode Time Study. Metode time study adalah metode pengukuran produktivitas tenaga kerja di lapangan dengan cara menentukan standard time suatu pekerjaan. Standard time diperoleh dari pengamatan. Pada pengamatan akan diukur nilai basic time yang akan diolah menjadi standard time, dan digunakan untuk menghitung nilai produktivitas. Dari hasil perhitungan diperoleh nilai produktivitas pekerja pada pekerjaan pemasangan bekisting kolom, bekisting balok, dan bekisting pelat berturut-turut adalah 7.07 m2/OH, 28.32 m2/OH, dan 35.81 m2/OH. Untuk nilai produktivitas pekerja pada pekerjaan pemasangan tulangan kolom, tulangan balok, dan tulangan pelat berturut-turut adalah 228.86 kg/OH, 397.55 kg/OH, dan 28.73 kg/OH. Sedangkan nilai produktivitas pada pekerjaan pengecoran kolom, pengecoran balok, dan pengecoran pelat berturut-turut adalah 78.14 m3/OH, 43.02 m3/OH, dan 16.42 m3/OH. Dari hasil analisa produktivitas menunjukkan bahwa letak antara material dan tempat pengerjaan, jumlah pekerja, relaxation allowances, material yang digunakan, dan penggunaan alat dalam pekerjaan adalah faktorfaktor yang mempengaruhi produktivitas pekerja pada pekerjaan struktur beton bertulang. ========================================================================== Labour productivity determine the success of project schedule realization, because its impact on conformity between project schedule and the progress in the site of construction. Therefore, the labour productivity of reinforced concrete structures works as one of the critical activity on project schedule, need to be analyzed. This final project aims to analyze labour productivity of reinforced concrete structures works and to find the factors that can affect the productivity of labour in the ITS Industrial Engineering Building project. The productivity is calculated by using time study method. Time study is a measuring method to calculate productivty of labour in the site of construction by observe and determine the standard time of a work. Standard time is obtained form observation. On the observation, we will obtain the value of basic time, and then it will be processed to standard time that used for calculate the productivity. Based on result of calculation, the productivity value of a labour for each installation of column formwork, beam formwork, and slab formwork respectively are 7.07 m2/OH, 28.32 m2/OH, and 35.81 m2/OH. productivity value of a labour for each installation of column reinforcement, beam reinforcement, and slab reinforcement respectively are 228.86 kg/OH, 397.55 kg/OH, and 28.73 kg/OH. And the productivity value of a labour for column casting, beam casting, and slab casting respectively are78.14 m3/OH, 43.02 m3/OH, and 16.42 m3/OH. While the result of productivity analysis shows that location between materials and workplace, the number of labours, relaxation allowances, materials used, and utilization of tools are the factors that can affect the labour productivity on reinforced concrete structures works.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 331.118 Mal a
Uncontrolled Keywords: Produktivitas, Standard Time, Basic Time, Faktor yang mempengaruhi produktivitas, Productivity, Factors That Affect Productivity.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > (S1) Undergraduate Theses
Depositing User: Mrs Anis Wulandari
Date Deposited: 21 Aug 2017 05:05
Last Modified: 21 Aug 2017 05:05
URI: http://repository.its.ac.id/id/eprint/48681

Actions (login required)

View Item View Item