Analisis Pengaruh Faktor Penyebab Non-Excusabe Delay Pada Proyek Konstruksi Gedung Di Manado

Andrean, Stevie (2018) Analisis Pengaruh Faktor Penyebab Non-Excusabe Delay Pada Proyek Konstruksi Gedung Di Manado. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3115203010-Master_Thesis.pdf]
Preview
Text
3115203010-Master_Thesis.pdf - Accepted Version

Download (2MB) | Preview

Abstract

Trend perkembangan industri konstruksi di Sulawesi Utara pada beberapa tahun terakhir ini menunjukan peningkatan yang cukup signifikan. Namun proyek konstruksi di Kota Manado selalu dihadapkan dengan masalah keterlambatan waktu penyelesaian. Permasalahan keterlambatan merupakan fenomena global yang terjadi didalam dunia konstruksi. Keterlambatan dapat secara negatif mempengaruhi kinerja proyek terutama pada waktu penyelesaian proyek. Walaupun telah banyak penelitian yang dilakukan mengenai penyebab keterlambatan dan pola hubungan antar faktor, masih banyak pola hubungan antar faktor yang dapat dikembangkan berdasarkan kajian literatur.
Berdasarkan kategori penyebab keterlambatan, penelitian ini khusus membahas non-excusable delay, dimana kontraktor memegang tanggung jawab penuh terhadap delay yang terjadi di proyek. Tujuan penelitian ini adalah untuk menganalisis hubungan antar faktor, serta pengaruhnya pada keterlambatan proyek konstruksi di Manado. Pengembangan model didasarkan pada kajian literatur dan penelitian terdahulu. Pengumpulan data primer melalui distribusi kuesioner kepada pihak manajer proyek, manajer lapangan atau pelaksana dari kontraktor yang pernah atau sedang menangani proyek konstruksi gedung di Manado. Hasil pengumpulan data dianalisis menggunakan metode Partial Least Square.
Hasil penelitian menunjukkan faktor Perencanaan Pelaksanaan Tidak Sesuai berpengaruh secara langsung dan positif terhadap keterlambatan proyek konstruksi di Manado yang dapat disimpulkan bahwa semakin tidak sesuainya perencanaan pelaksanaan di lapangan maka semakin besar keterlambatan yang terjadi. Disisi lain, faktor Perencanaan Pelaksanaan Tidak Sesuai dipengaruhi oleh faktor Manajemen Lapangan Tidak Efisien sedangkan faktor Manajemen Lapangan Tidak Efisien secara signifikan dipengaruhi oleh faktor Kompetensi Kontraktor Kurang.

=======================================================================================
Development of construction industry in Manado in recent years shows a significant increase, but many of construction projects in Manado are experiencing delays. Delays are the global phenomena occurred in construction industry. Delays negatively affect project performance especially project completion date. Although much research has been done concerning on the cause of delays and the relation between the main factors, there are still many patterns of relation between the main factors that can be developed based on literature review.
Based on the category which causes delay, this research especially discuss about Non-Excusable Delays, in which contractors holds the responsibility for the delay. The purpose of this study is to analyze the relation between factors, and its effects on delays in Manado. Model development is based on previous research and literature review. Primary data collection was done through distribution of questionnaires to project managers, site managers or implementers of contractors who had or are currently dealing with building construction projects in Manado. Collected data was analyzed using Partial Least Square.
The results reveal that Improper Execution Planning directly and positively affect construction project delay, which can be concluded that the more improper execution planning occur then it will lead the construction project to be delayed. On the other hand, Improper Execution Planning is influenced by Inefficient Site Management while Inefficient Site Management is significantly influenced by Poor Contractor Competencies.

Item Type: Thesis (Masters)
Additional Information: RTL 658.404 And a-1 3100018074513
Uncontrolled Keywords: Proyek Konstruksi Gedung, Non-Excusable Delay, Partial Least Square, Manado
Subjects: T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22101-(S2) Master Theses
Depositing User: Stevie Andrean
Date Deposited: 05 Mar 2018 03:58
Last Modified: 02 Jul 2020 06:58
URI: http://repository.its.ac.id/id/eprint/49713

Actions (login required)

View Item View Item