Perencanaan Crane Barge SWL 25 TON Jarak jangkauan 4,5 meter sampai dengan 28 meter

Arini, Seviana Setyo (2014) Perencanaan Crane Barge SWL 25 TON Jarak jangkauan 4,5 meter sampai dengan 28 meter. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img] Text
4212105015-Undergraduate Thesis.pdf - Published Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

Semakin bertambahnya kebutuhan minyak dunia perusahaan minyak dan gas banyak membuka lapangan pekerjaan di bidang explorasi migas. Untuk meningkatkan produksi dan efektifitas kerja diperlukan Crane barge atau work barge untuk menunjang proses pengeboran dan maintenance. Dalam crane barge ini memiliki banyak sistem salah satunya adalah proses bongkar muat, dimana untuk proses bongkar muat menggunakan crane. Crane mempunyai peranan yang penting untuk menunjang aktifitas. Dari segi fungsi crane untuk mengangkat dan membantu dalam operasional kapal, maka diperlukan konstruksi yang kuat agar crane tersebut bisa bekerja optimal. Dalam pengerjaan tugas akhir ini akan dipilih crane dengan jenis deck crane dengan SWL 25 TON difokuskan untuk mendesain pondasi crane yang ada pada barge. Metode yang digunakan untuk menganalisa tegangan pada pondasi crane menggunakan Finite Element Methode (FEM) atau metode elemen hingga pada software Solidworks dengan pemodelan terlebih dahulu. Dari hasil analisa diperoleh hasil FOS dari konstruksi sebesar 2,5 yang berarti konstruksi tersebut sudah aman untuk mengangkat beban maksimal ====================================================================================================== The increasing world oil needs. Companies of oil and gas a lot of open jobs in the field of oil and gas exploration. To boost production and effectiveness of work required. Crane barge or a work barge to support drilling and maintenance processes. Crane barge has many systems one of which is the process of loading and unloading, loading and unloading process for when using a crane.Crane has an important role to support the activity. In terms of the functions of the crane to lift and assist in the operation of the ship, then needed a strong construction so that the crane can work optimally. In this final project will be chosen by the type of crane is deck crane with 25 TONS SWL focused on designing foundation of the crane on the barge. The methods used to analyze the stress on the foundation of the crane using Finite Element Method (FEM) the first to modeling with Solidworks software. From the results of the analysis of the obtained results of the FOS from the construction of 2.4which means that construction was safe to lift maximal loads

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 621.873 Ari p
Uncontrolled Keywords: Crane Barge, Finite element , Solidworks.
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM293 Shipping--Indonesia--Safety measures
Divisions: Faculty of Marine Technology > Marine Engineering > (S1) Undergraduate Theses
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 05 Feb 2018 03:17
Last Modified: 05 Feb 2018 03:17
URI: http://repository.its.ac.id/id/eprint/51122

Actions (login required)

View Item View Item