Arini, Seviana Setyo (2014) Perencanaan Crane Barge SWL 25 TON Jarak jangkauan 4,5 meter sampai dengan 28 meter. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Text
4212105015-Undergraduate Thesis.pdf - Published Version Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
Semakin bertambahnya kebutuhan minyak dunia perusahaan
minyak dan gas banyak membuka lapangan pekerjaan di
bidang explorasi migas. Untuk meningkatkan produksi dan
efektifitas kerja diperlukan Crane barge atau work barge
untuk menunjang proses pengeboran dan maintenance.
Dalam crane barge ini memiliki banyak sistem salah
satunya adalah proses bongkar muat, dimana untuk proses
bongkar muat menggunakan crane. Crane mempunyai
peranan yang penting untuk menunjang aktifitas. Dari segi
fungsi crane untuk mengangkat dan membantu dalam
operasional kapal, maka diperlukan konstruksi yang kuat
agar crane tersebut bisa bekerja optimal. Dalam pengerjaan
tugas akhir ini akan dipilih crane dengan jenis deck crane
dengan SWL 25 TON difokuskan untuk mendesain pondasi
crane yang ada pada barge. Metode yang digunakan untuk
menganalisa tegangan pada pondasi crane menggunakan
Finite Element Methode (FEM) atau metode elemen hingga
pada software Solidworks dengan pemodelan terlebih
dahulu. Dari hasil analisa diperoleh hasil FOS dari
konstruksi sebesar 2,5 yang berarti konstruksi tersebut
sudah aman untuk mengangkat beban maksimal
======================================================================================================
The increasing world oil needs. Companies of oil and gas a
lot of open jobs in the field of oil and gas exploration. To
boost production and effectiveness of work required. Crane
barge or a work barge to support drilling and maintenance
processes. Crane barge has many systems one of which is
the process of loading and unloading, loading and unloading
process for when using a crane.Crane has an important role
to support the activity. In terms of the functions of the crane
to lift and assist in the operation of the ship, then needed a
strong construction so that the crane can work optimally. In
this final project will be chosen by the type of crane is deck
crane with 25 TONS SWL focused on designing foundation
of the crane on the barge. The methods used to analyze the
stress on the foundation of the crane using Finite Element
Method (FEM) the first to modeling with Solidworks
software. From the results of the analysis of the obtained
results of the FOS from the construction of 2.4which means
that construction was safe to lift maximal loads
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSSP 621.873 Ari p |
Uncontrolled Keywords: | Crane Barge, Finite element , Solidworks. |
Subjects: | V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM293 Shipping--Indonesia--Safety measures |
Divisions: | Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis |
Depositing User: | Mr. Tondo Indra Nyata |
Date Deposited: | 05 Feb 2018 03:17 |
Last Modified: | 05 Feb 2018 03:17 |
URI: | http://repository.its.ac.id/id/eprint/51122 |
Actions (login required)
View Item |