Pengukuran Waktu Kerja Pada Proses Pembuatan Rangka Utama Underframe Gerbong Kereta Api PPCW Di PT INKA (Persero) Madiun

Larasati, Maya (2015) Pengukuran Waktu Kerja Pada Proses Pembuatan Rangka Utama Underframe Gerbong Kereta Api PPCW Di PT INKA (Persero) Madiun. Doctoral thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
1312030028-Non Degree.pdf - Published Version

Download (43MB) | Preview

Abstract

PT. INKA (Persero) merupakan perusahaan manufaktur sarana kereta api dan transportasi pertama yang berada di Asia Tenggara. Penelitian dilakukan pada proses pembuatan rangka utama underframe gerbong kereta api PPCW, dimana PT. INKA (Persero) mempunyai target memproduksi 3 underframe dalam satu hari akan tetapi pada kenyataanya produksi tidak memenuhi target yang telah ditentukan. Maka, dilakukan penelitian untuk menentukan waktu standar, output standar dan keseimbangan lintas produksi. Pengambilan data dilakukan dengan diambil satu karyawan secara random pada masing-masing elemen kerja. Selanjutnya dilakukan pengamatan awal (n) sebanyak 30 waktu kerja untuk setiap elemen. Berdasarkan hasil analisis diketahui waktu standar yang dapat digunakan PT. INKA (Persero) untuk stasiun kerja adalah 106,9 menit. Output standar yang dihasilkan stasiun kerja sebesar 6,4 unit/hari. Keseimbangan lintas produksi menghasilkan jumlah stasiun kerja minimal adalah 2 stasiun kerja dengan waktu siklus stasiunnya adalah 240 menit/unit dan efisiensi lini perakitan sebesar 88,8%. ======================================================================================================== PT.INKA (Persero) is the first manufacturing company who is specialist in producing train and other integrated transportation which is located in South East Asia. This study focused on PPCW underframe of wagon train production process. In this process, the company has objective to producing 3 underframe in one day, but in fact, the production process is not capable of fulfilling that. This study has some objectives, to determine the standard time, the standard output and the line balancing production. Data collectiom was performed by one employees drawn at random on each elemen of the work. Furhermore the initial observations 30 times each work element. Based on the result of the analysis, it is found that the standard time to production one PPCW underframe of wagon train is 106,9 minutes. The standard output from analysis is 6,4 unit per day. Line balancing the production of produce 2 work station with the time of cycle station 240 minutes per unit and efficiency is 88,8%.

Item Type: Thesis (Doctoral)
Additional Information: RSSt 519.55 Lar p
Uncontrolled Keywords: Keseimbangan Lintas Produksi, Output Standar, PPCW, Waktu Standar
Subjects: H Social Sciences > HF Commerce > HF5549 Job analysis
Divisions: Faculty of Mathematics and Science > Statistics > (D3) Diploma
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 03 Apr 2018 02:27
Last Modified: 24 Aug 2018 03:37
URI: http://repository.its.ac.id/id/eprint/51672