Analisis Risiko Pembangunan Tower A Pada Proyek "X" Surabaya

Trispantia, Aldia Wira (2019) Analisis Risiko Pembangunan Tower A Pada Proyek "X" Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09111540000100-Undergraduate_Theses.pdf] Text
09111540000100-Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2023.

Download (5MB) | Request a copy

Abstract

Pembangunan Tower A pada Proyek “X” Surabaya merupakan salah satu proyek terbesar yang dimiliki oleh PT X dengan masa waktu pembangunan selama empat tahun. Waktu pembangunan yang cukup lama tentunya akan menimbulkan berbagai jenis risiko yang dapat memengaruhi pembangunan Proyek “X” Surabaya. Penelitian ini bertujuan untuk mengindentifikasi, menilai, memeringkatkan, dan memberikan aksi mitigasi terhadap faktor risiko yang dapat memengaruhi Proyek “X” Surabaya. Penelitian ini menggunakan metode peta risiko untuk melakukan penilaian risiko dan analytical hierarchy process (AHP) untuk melakukan perbandingan pembobotan tiap faktor risiko. Responden dalam penelitian ini berjumlah lima orang, yang terdiri dari bagian arsitektur, sipil struktur, pengendali operasional proyek (POP), mechanical, electricity, and plumbing (MEP), dan site engineering manager.
Hasil identifikasi didapatkan 41 faktor risiko, yang terdiri dari 11 faktor risiko bagian arsitektur, 11 faktor risiko bagian sipil struktur, 6 faktor risiko bagian POP, dan 13 faktor risiko bagian MEP. Hasil penilaian dan pemeringkatan didapatkan 26 faktor risiko yang memerlukan aksi mitigasi risiko, faktor risiko tersebut terdiri dari 11 faktor bagian arsitektur, dengan prioritas adalah keterlambatan waktu penyelesaian desain oleh konsultan. 6 faktor bagian sipil struktur, dengan prioritas adalah ketidaksesuaian desain struktur bangunan. 5 faktor bagian POP, dengan prioritas adalah ketidaktersediaan aliran arus kas. Dan 4 faktor bagian MEP, dengan prioritas adalah kualitas material yang tidak sesuai spesifikasi. Penelitian ini diharapkan mampu menjadi bahan referensi atau sebagai bahan pertimbangan pemilik Proyek “X” Surabaya dalam menentukan tindakan terhadap setiap faktor risiko yang dapat memengaruhi Proyek. ================================================================================================
Construction of A Tower on the “X” Surabaya project is one of the biggest project of PT X which have contruction period for four years. Long period of constraction time absolutely give many risk that affect the “X” Surabaya project. This research aims to identify, assess the likelihood of occurrence and degree of impact, ranking based on weighted value, and give mitigation action to risk factors that affect the “X” Surabaya project. This research is using risk mapping method to assess the risk factors and analytical hierarchy process (AHP) to make priorities of each risk factors. There are five respondents for this research, such as architecture, civil engineering, cost control, mechanical, electricity, and plumbing (MEP), and site engineering manager.
The result show there are 41 risk factors, the risk factors consist of 11 risk factor of architect, 11 risk factors of civil structure, 6 risk factors of cost control, and 13 risk factors of MEP. Result from assessment and ranking of risk factors show there are 26 risk factors that need to mitigation action. The risk factors consist of 11 risk factors of architect, with priority is delay in design completion by the consultant. 6 risk factors of civil structure, with priority is incompatibility building structure design. 5 risk factors of cost control, with priority is unavailability of cash flow. And 4 risk factors of MEP, with priority is the quality of material not according to spesification. This research is expected to be a reference or as a consideration of the owner of the “X” Surabaya project to make any decision for the risk factors that could affected the “X” Surabaya project.

Item Type: Thesis (Undergraduate)
Additional Information: RSMB 658.155 Tri a-1 2019
Uncontrolled Keywords: Faktor Risiko, Peta Risiko, Analytical Hierarchy Process (AHP), Aksi Mitigasi Risiko
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > TH Building construction > TH438 Construction industry--Management. Project management.
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Business Management > 61205-(S1) Undergraduate Thesis
Depositing User: Aldia Wira Trispantia
Date Deposited: 18 Nov 2021 04:09
Last Modified: 18 Nov 2021 04:09
URI: http://repository.its.ac.id/id/eprint/61339

Actions (login required)

View Item View Item