Perencanaan kelistrikan untuk energi terbarukan di Kabupaten Bulungan dan Tana Tidung

Sari, Indah Purnama (2015) Perencanaan kelistrikan untuk energi terbarukan di Kabupaten Bulungan dan Tana Tidung. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2511100042-Undergraduate_Theses.pdf]
Preview
Text
2511100042-Undergraduate_Theses.pdf - Published Version

Download (5MB) | Preview
[thumbnail of 2511100042-paperpdf.pdf]
Preview
Text
2511100042-paperpdf.pdf - Published Version

Download (375kB) | Preview
[thumbnail of 2511100042-presentationpdf.pdf]
Preview
Text
2511100042-presentationpdf.pdf - Presentation

Download (2MB) | Preview

Abstract

Permintaan energi listrik menunjukkan peningkatan permintaan setiap
tahunnya, namun penyediaan energi listrik yang ada tidak mampu mencukupi
permintaan yang semakin meningkat. Beberapa unit layanan daerah di Kabupaten
Bulungan hanya mampu melayani listrik tidak lebih dari 12 jam, sedangkan
pemadaman bergilir juga masih terjadi di Kabupaten Tana Tidung. Kendala yang
juga terjadi dalam pemenuhan kebutuhan listrik adalah ketersediaan sumber daya
fosil untuk bahan baku energi listrik sudah semakin terbatas, sehingga dibutuhkan
alternatif energi lainnya, salah satunya adalah energi terbarukan. Penelitian ini
bertujuan untuk melakukan proyeksi kebutuhan beban listrik mendatang dan
mengidentifikasi potensi sumber energi terbarukan di daerah setempat. Proyeksi
kebutuhan beban listrik dilakukan dengan pendekatan ekonometri dan sektoral
serta diselesaikan dengan software LEAP (Long Range Energy Planning). Dalam
penelitian ini dilakukan identifikasi potensi sumber energi terbarukan di daerah
setempat yang meliputi energi mikrohidro dan energi surya. Dari hasil identifikasi
potensi energi terbarukan tersebut maka diberikan rekomendasi berupa
perencanaan lokasi dan jumlah pembangkit sesuai hasil proyeksi sebelumnya.
Untuk memastikan keandalan dan keberlanjutan produksi energi listrik, maka
dalam penelitian ini juga dilakukan integrasi sistem produksi dengan pendekatan
proses bisnis CIMOSA (Computer-Integrated Manufacturing for Open System
Architecture). Selanjutnya dilakukan estimasi biaya pembangunan dan analisa
manfaat-biaya (Benefit Cost Ratio) untuk menilai kelayakan pembangkit listrik
energi terbarukan tersebut. Hasil analisa menunjukkan potensi energi terbarukan
yang tersedia di kedua Kabupaten ini dapat memenuhi kebutuhan listrik 11,974
rumah tangga di Kabupaten Bulungan dan 2,592 rumah tangga di Kabupaten Tana
Tidung dari tahun 2015-2030. Pembangunan kedua pembangkit ini juga dinilai
layak hingga tahun 2030 dengan nilai BCR lebih dari satu. ========= Electrical energy demand was increased, but the supply was unable to
meet the demand. Kabupaten Bulungan and Kabupaten Tana Tidung are two
district in North Kalimantan Province were also faced the supply problem. Some
services units in Kabupaten Bulungan and Kabupaten Tana Tidung only capable
of serving electricity no more than 12 hours per day. The availability of fossil
resources as the raw material of energy electricity has become more limited so
that there is a need for other energy alternative, one of them is renewable energy.
This study aimed to conduct electricity forecasting from year 2015 to 2030 and
identify potential sources of renewable energy in the local area. Electricity
forecasting in this study was conducted by econometrics and sectoral approach
well as solved with software LEAP (Long Range Energy Planning). Furthermore,
it has been conduct identified the potential of renewable energy sources in the
local area which includes micro-hydro energy and solar energy. Based on results
above, the study give reccomendation of location and number of power plants in
Kabupaten Bulungan also Tana Tidung. To ensure the reliability and
sustainability of the electricity production, so in this study was also conducted
with the system integration production with business process approach CIMOSA
(Computer-Integrated Manufacturing for Open System Architecture).
Furthermore, estimation cost of construction and cost-benefit analysis (Benefit
Cost Ratio) was also conducted to assess the feasibility of the renewable energy
power plants. The result show that the potential of renewable energy can meet the
electricity needs of 11.974 households in Bulungan and 2,592 households in Tana
Tidung from year 2015 to 2030. Construction of two plants is also considered
feasible until 2030 with value of BCR more than one.

Item Type: Thesis (Undergraduate)
Additional Information: RSi 333.793 2 Sar p 2511100042
Uncontrolled Keywords: Analisis Manfaat Biaya (BCR), Energi Mikrohidro, Energi Surya, Energi Terbarukan, LEAP, Benefit Cost Ratio (Bcr), LEAP, Microhydro Energy, Renewable Energy, Solar Energy
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD9685.A2 Electric utilities. Electrification
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 14 Mar 2019 04:47
Last Modified: 14 Mar 2019 04:47
URI: http://repository.its.ac.id/id/eprint/62498

Actions (login required)

View Item View Item